My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
2300 - Underground Storage Tank Program
>
PR0231400
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
4/27/2020 12:24:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231400
PE
2361
FACILITY_ID
FA0003539
FACILITY_NAME
S B GAS & MARKET
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23309031
CURRENT_STATUS
01
SITE_LOCATION
515 W ELEVENTH ST STE 301
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231400_515 W ELEVENTH_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aug,07 12 03:09p Reliable Petrole mA 209-845-8953 p.7 <br /> Materials 1OPW 71SO Overfill <br /> lfalvt bariy asf um � t:Important ' Prevention Valves <br /> Float:lgitrle rubberd®sed cel faart s, = In order to prevent product <br /> i spillage from the Undergrounc ` The GARB-certified OPW 71 SO <br /> Valval Aluminum . Storage TV*(UST),propaty <br /> Seals:Viton® maintained delivery equipment vapor-tight Overfill Prevention Valve <br /> an a proper connection at the <br /> Upper&Iter Dm Tube:Aluminum r , <br /> tiger.-fs adaptor are essential. is designed to prevent the overfill of <br /> r- 1 Delivery personnel should be i <br /> underground storage tanks by providing <br /> Plastic parts:Aceh: managed and trainwl to inspect ° <br /> Hardware:Stainles steel delivery ,ars and homes for a positive shut-off of product delivery. <br /> damaged and missing parts. The shut-off valve is an integral part of <br /> They should aWays make <br /> / certain there is a positive the drop tube used for r <br /> °�. Po- A gravity Mktg.The <br /> cotneckn between the adaptor <br /> Features and efbam,fi delivery equpment OPW 71 SO allows easy installation <br /> is not properly maintained,or the (vurthaut breaking mri rets)and requires <br /> Ar Simple,Easy and uick brisliallatlion elbow is not securely coupled <br /> —no excavation or pedal manholes to the adapt',a serious spI no special manholes. <br /> may result when the 0K%171.50 The OPW 7150 is a vapor-tight two- <br /> closes,Musing a hazard and <br /> ♦Economical—cost i a traction of <br /> environmental contamination. stage shut-off valve.When the liquid <br /> expensive,complic ted and difficult- NOTE:The OPW ftso Is level rises to about 95%of tank capacity, <br /> to-install valves, designed for use on tight-fill the valve mechanism is released, <br /> • gravity drop applications only. <br /> Furnished Camp) a—supplied closing automatically with the flow.Thi <br /> ;; Da not use for prassure ftH <br /> with new upper anc louver drop tubes, applications, reduces the flow rate to approximately <br /> mounting hardware nd thorough 5 gpm through a bypass valve.The <br /> instructions for qui job site time. operator may then stop the filling <br /> •Completely Autorr atic Operation—no i Retrofits Directly—for both new and i process and disconnect and drain the <br /> prechecks to perfor n,no resets and no existing tanks A&4"fill risers. delivery hose.As long as the liquid <br /> overrides to be broN on or abused. #Wick Drain Feature—automatically exceeds the 95%level,the valve will <br /> •No Pressurization f the Tank— drains hose when head pressure is close automatically each time delivery <br /> operates directly fro liquid level. relieved. is attempted, <br /> ®Will Accept a Dips ick for Gaugfng 4 Best Flow Rate in The Industry* If the delivery is not stopped and <br /> " <br /> Test-witnessed byr•Morner,Inc.,an independent laboratory.Results available upon the liquid rises to about 98%of tank <br /> request capacatty,the bypass valve closes <br /> Advantages of i Pirev ion <br /> completely.No additional Iktuld can flow <br /> e r <br /> Compared to-O afiig riburr6 sy%tenw <br /> into the tank until the level drops below <br /> Completely A atfc Oporadoni . ,Delivery Opera a reset point. <br /> -�does rioto the alero►ess t <br /> �Y odttct ilovus unlntpeded:irdo <br /> geed of on of ft dellv,e <br /> until file Mose`kick tIQ accolimpalrtios 7160 lrsatarton Sheet Order <br /> ry ... <br /> attendant for ce. 'r,#y of overfillthe valve:SW tfiprcyrcl a clear Number:HISSWA <br /> Prevention, 5160011iatth0 fiqulobAs re hed : .. <br /> !►.Keep tlua Fop tJST-"® s - shirt-o#:B®vel <br /> EPA Require" e[!Wnatitw .Simple.and lti ". Ins n <br /> possible leaks at ase W4littfngs <br /> in ttuo-pvrnteruiaaxlel 91 <br /> and the.need:for iouble containment <br /> ' onsi no addidonal.mavati <br /> ottwent lines. <br /> manholes or vent pipi zagbkw,- <br /> floes kot.Rely a. Presute in <br /> :. . <br /> UST to$top Flo. ,•�allpva�rt . fill <br /> arses and redudn spill tisk, <br /> Listings and _ Look for this bbd for <br /> , authemic OPW M <br /> Certifications I GII(amW Ar L App-md pmdu" <br /> w <br /> Ft®..urm a08rd <br /> O 6 j <br /> R��6�IFAdV <br />
The URL can be used to link to this page
Your browser does not support the video tag.