Laserfiche WebLink
SWRCB, January 2002 page Of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Equith11/0verfill Containmert Boxes 0 <br /> Spill/Overf ill Containment Boxes are Present, but were Not Tested 0 <br /> Test Method Devel oped By: 0 EEO II Bucket Manufaoturer Li Industry Standard 0 Professional En near <br /> D Other(Sped fy) <br /> Test Method Used: El Pressure il vacuum 0 Hydrostatic <br /> D Other(,gxrjfy) <br /> Test Equi prnert Used: Equipment Resolution: <br /> MEE= <br /> Box# Spill Box# Spill Bcx# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressurefvactszrAvater and <br /> starti rig test: <br /> Test Start Ti n-e <br /> Initial Read ng(R): <br /> Test End Ti mec <br /> Final Readi rig(RF): <br /> Test Duration: <br /> Change in Read ng(RF-R): <br /> Pass/Fai I Threshold or <br /> Criteria <br /> Test Result: 0 Paw 0 Fal I n Paw 0 Fai I El Pass D Fail 0 Pass [I Fai I <br /> CommentS—(include information on repairs madeprior to testi!N,and recommended fblliled! ) <br /> C;;,f(LL p3g Wq.Ij0Gt- <br />