My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
2300 - Underground Storage Tank Program
>
PR0231400
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
4/27/2020 12:24:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231400
PE
2361
FACILITY_ID
FA0003539
FACILITY_NAME
S B GAS & MARKET
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23309031
CURRENT_STATUS
01
SITE_LOCATION
515 W ELEVENTH ST STE 301
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231400_515 W ELEVENTH_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRM FAX NO. Aug. 10 2015 03:20PM P2 <br /> Retum to Compliance Letter REGEIVEE) <br /> SB Gas and mark9t AUG 10 2015 <br /> 515 W 111h St ENVIRONMENTAL <br /> 1- <br /> Tracy Ca. 95376 ATL4 r)!=PAPT!A!=MT <br /> UST Inep-eets-e®.LD-*-,^-rt J 13 1019 <br /> 1) #103 Current financial responsibility documents not submitted <br /> Action: Submitted the current financial responsibility documents to CEPS <br /> 2) #106 Monitoring and response plans not current or approved by the EHD. <br /> Achim- VOW nut.and upInaded new mnnitnring and re. Re planq. Awaiting apprnval <br /> 3) #107 Plot plan/site map not submittedor Wed to completely show where monitoring is <br /> performed <br /> Action. Uploaded new site plan to CERS.Plan had been approved. <br /> 4) 41.1'AY-nilp-d to mihmit mmitnrina -zyqtpm rp.rdifirstjoin trstyemrt vAthin in dav-.q <br /> Action-Jn1bimed technician of the delay, will be sure to verify submittal next te%, <br /> 5) #1.25 Failed to submit a written response within 30 days of receiving an inspection report <br /> Action! informed testing technician,will be more careful in Anure. <br /> 6) #209 Designated operator employee training not performed or log not-kept. <br /> Action: Informed our designated operator.Training will be,completed by all employees. <br /> 7) #309 Monitoring in the UDCs failed to activate an audible and visual alarm or stop the flow of <br /> product. <br /> Action:The 404 Latching Controller was replaced my Wayne HMC on 7/24/2015, Still <br /> awaiting retest. <br />
The URL can be used to link to this page
Your browser does not support the video tag.