Laserfiche WebLink
.__............ <br /> 0 '0 RECEIVEL, <br /> SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING 2015 <br /> Test Method Developed By: UDC Manufacturer Industry Standard X <br /> Other(Specify) ny! <br /> Test Method Used: 'Pressure "I Vacuum X Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002_ <br /> UDC# 1&2 UDC#3&4 UDC#5&6 UDC#7&8 <br /> UDC Manufacturer: Bendel Corp. Bendel Corp. Bendel Corp. Bendel Corp. <br /> UDC Material: Poly Plastic Poly Plastic Poly Plastic Poly Plastic <br /> UDC Depth: 15" 15" 15" 15" <br /> Height from UDC Bottom to Top Enters from bottom Enters from bottom Enters from bottom Enters from bottom <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to Enters from bottom Enters from bottom Enters from bottom Enters from bottom <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Small amount of Dry Dry Dry <br /> testing: Diesel <br /> Portion of UDC Tested Water Line 12" Water Line 12" Water Line 12" Water Line 12" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both No No No No <br /> product and water)?` <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail- Yes Yes Yes Yes <br /> safe shutdown?" <br /> Was fail-safe verified to be No No No No <br /> operational?* <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time: 11:45 12:25 12:30 11:50 <br /> Initial Reading(Ri): .001 .001 .001 .001 <br /> Test End Time: 12:15 12:55 1:00 12:20 <br /> Final Reading(RF): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-RI): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes Yes <br /> Was sensor properly replaced and Yes Yes Yes Yes <br /> verified functional after testin ? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Wiped out small amount of Diesel from UDC's 1&2,prior to Testing. <br /> ' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to a y of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />