Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1.FACILITY INFORMATION <br /> Facility Name: SB GAS&MARKET Date of Testing: 7-29-2014 <br /> Facility Address: 515 W 11TH ST TRACY CA <br /> Facility Contact: Ken Phone: 209-607-0484 IL.%JL.1 V D <br /> Date Local Agency Was Notified of Testing:7-10-14 <br /> Name of Local Agency Inspector(if present during testing): MICHELLE SEP 1 <br /> 2.TESTING CONTRACTOR INFORMATION ENVIRONMENTAL <br /> Company Name: AFFORDA TEST 416 2"a Street Galt,CA 95632 (209)744-0112 Fax: (209)744-0116 <br /> Technician Conducting Test: ❑Lyle D.Nimmo ❑ Zane A.Nimmo ® David A.Winkler ❑ Felix G.Ramirez <br /> 5249115-UT 5263322-UT 5263373-UT 5273934-UT <br /> Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ®Hydrostatic ❑Vacuum ❑Other <br /> Test Equipment Used: h20 and tape measure Equipment Resolution: 1/16 <br /> Identify Spill Bucket(By Tank 1 87 2 91 3 DSL 4 <br /> Number, Stored Product, etc.) <br /> ®Direct Bury El Direct Bury <br /> Bucket Installation Type: ®Direct Bury ®Direct Bury El Contained in El Contained in <br /> ❑Contained in Sump El Contained in Sump Sump Sum <br /> Bucket Diameter: 11 11 11 <br /> Bucket Depth: 15 15 15 <br /> Wait time between applying -- <br /> vacuum/water and start of test: <br /> Test Start Time(TI): 1 1 1 <br /> Initial Reading(Ri): 14 14 13.50 <br /> Test End Time(TF): 2 2 2 <br /> Final Reading(RF): 14 14 13.50 <br /> Test Duration(TF—TI): IHR IHR IHR <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold or 1/16 1/16 1/16 <br /> Criteria: <br /> Test Result: ZPass ❑Fail I ®' Pass ❑Fail Z Pass '❑Fail ❑ Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: Date 7-29-2014 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />