My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
2300 - Underground Storage Tank Program
>
PR0231400
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
4/27/2020 12:24:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231400
PE
2361
FACILITY_ID
FA0003539
FACILITY_NAME
S B GAS & MARKET
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23309031
CURRENT_STATUS
01
SITE_LOCATION
515 W ELEVENTH ST STE 301
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231400_515 W ELEVENTH_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6�0=13 MAINE <br /> WT <br /> L �7751111 <br /> . � ? Ut � <br /> a <br /> 01 WE VIV, Chi <br /> TT. NARRAILY- <br /> DATE ACTIVITY ACTION RECORDED <br /> 04/17/02 Sent letter stating monitoring certification,PLLD and line tightness results have not MSL <br /> been received. <br /> 07/02/02 Conducted routine inspection. See OIR. DHC <br /> 08/16/02 Mailed follow up letter to operator regarding 07/02/02 inspection. See file copy for MSL <br /> details. <br /> 10/04/02 Prepared referral letter to district attorney's office. MSL <br /> 10/28/02 Case referred to DA KF <br /> 11/12/02 Met with Mr.Berla Ramesh at D. Irey's office. He agreed to get all of his testing done KF <br /> within one week by Shaw's Maintenance. We will schedule another meeting in Dec <br /> 2002. <br /> 11/18/02 Fax list of secondary containment testers to Berla Ramesh at 835-1634. KF <br /> 12/09/02 Filed secondary containment notifications. DMA <br /> 01/15/03 Witness monitoring certification with Robert Bush of Elite IV. Owner submitted SB989 SCS <br /> Test result(fail). Annular sensor of 87 needs to be replaced or repaired. See OIR. <br /> 01/21/03 Approved permit to change annular sensor INCON TSP-EIS of 87 Tank. SCS <br /> 01/22/03 Witness the function of re laced annular sensor TSP-EIS SCS <br /> 03/04/03 Mailed follow up letter for violations noted 01/15/2003. SCS <br /> 04/16/03 Filed line tightness result(Pass). SCS <br /> 06/23/03 Filed line tightness passed result. SCS <br /> 03/16/04 Mail Monitoring Certification reminder via certified mail and regular mail. SCS <br /> 04/09/04 File Certified mail receipt. SCS <br /> 04/16/04 File Review/Raiendra Yadav SH <br /> 05/03/04 Filed Monitoring Certification notification by Cham ion on 05/11/04. SCS <br /> 05/11/04 Routine inspection and monitoring certification. The Panel of INCON is not SCS <br /> functioning. The display and keypad did not work. When place STP sump sensor into <br /> alarm,there is audio alarm and cannot be reset since keypad is not working. Monitoring <br /> Certification can not be performed. Secondary containment did not pass SB989 <br /> requirements. There are still components fail secondary containment. There are no <br /> sensor,no float&chain in UDC. Major violations. Owner's Wife(Sue Virla)stated <br /> (on the phone of store)that this facility will not pump gas. This facility was tapped up <br /> around dispenser before I left site. <br /> 05/14/04 Filed out of compliance for Form A&B. SCS <br /> 05/26/04 Received permit from Elite IV SR0038162. <br /> 05/27/04 Approved permit SR0038162. <br /> 06/04/04 Witnessed monitoring certification. All UDC Sensors Tested OK.Incon Monitoring SCS <br /> panel tested OK. Leak Detector Tested OK. All Spill Buckets Failed. <br /> 06/15/04 Filed Monitoring&Response Plan,Form A&B,Financial Responsibility&letter from SCS <br /> CFO&Sent Form A&B to Accounting. <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.