Laserfiche WebLink
40 <br /> >Criteria in subsection (g) is not met therefore, this underground storage tank system is required <br /> to have this test performed. <br /> CCR 2637(b) All monitoring equipment used to satisfy the requirements of this article shall be <br /> installed, calibrated, operated and maintained in accordance with manufacture's instructions, and <br /> certified every 12 months for operability, proper operating condition, and proper calibration. <br /> Written records shall be maintained as required in section 2712. <br /> -> This testing has not been performed within the required timeframe. <br /> Ha7ardaus Waste Violations <br /> CCR 66262.12(a) Except as specified in(d), a generator shall not treat, store, dispose of, or <br /> transport or offer for transportation,hazardous waste without having received and Identification <br /> Number. <br /> -> This facility generates hazardous waste in the form of fuel filters and spent absorbent, <br /> therefore, an EPA identification number must be obtained. <br /> V. ATTACHMENTS <br /> 1. Original letter sent to the facility dated April 17, 2002. This letter stated that the <br /> underground storage tank system was due for their required testing. , <br /> 2. Underground storage tank inspection report written by Dennis Catanyag, REHS dated July <br /> 2, 2002. <br /> 3. Hazardous waste generator inspection report written by Michelle Sterni Le, RENS dated <br /> July 2, 2002. <br /> 4. Underground storage tank inspection follow up letter mailed to the owner dated August 16, <br /> 2002 <br /> 5. Hazardous waste inspection follow up letter mailed to the owner dated August 16,2002. <br /> 6. A copy of the underground storage tank file. " <br /> 7. A copy of the hazardous waste generator file. <br /> Michelle Sterni Le,REHS Dat <br /> r, <br /> Page 3 of 3 <br />