Laserfiche WebLink
Dynamic Back Pressure Test <br /> Afforda—Te$t 416 2nd Street ® TP 201.4 <br /> Galt, Ca. 95632 <br /> (209)744-0112(800)524-9087 FAX(209)744-0116 Z Static Pressure Decay Test <br /> TP 201.3 <br /> Owner/Contractor/Eng: TEST DATE: 7/11/2018 TIME: UST ® AST [I <br /> TECHNICIAN NAME: <br /> Zane A.Nimmo SJV#0083 <br /> SITE NAME: S B GAS & MARKET E] PT E] StartupTest ® Compliance Test <br /> ' <br /> Address: 515 W. 11TH STREET <br /> City:TRACY, CA 95376 1 declare, under penalty of perjury under the laws of the state Ins ector:LISA M <br /> of California that based on information and belief formed <br /> Phone: after reasonable inquiry, the statements and information <br /> Contact: <br /> provided in the document are true, accurate,and complete. Present ® Not Present EJ <br /> Confirmation# 18-25625 TECH SIGNATURE: <br /> Permit or Facility#N-2477-2-3 <br /> #DISPENSERS 4 DISPENSER Make: WAYNE NOZZLE Make: HEALY PV Valve Make:HUSKY <br /> #TOTAL NOZZLES 8 Model: Model: 900 Model: 5885 <br /> MANIFOLDED: Yes ® No❑ BALANCE ❑ ASSIST ® Assist Type:VR 203 <br /> Tank 1 Tank 2 Tank 3 Tank 4 TOTAL <br /> Fuel Grade 87 91 ALL Initial pressure before testing--6.39 "we <br /> #Nozzles per Tank 8 __ __ <br /> EQUIPMENT <br /> Actual Tank Capacity 12,032 6,016 18,048 Decay: Blockage: <br /> Gasoline Volume 7,268 2 620 9,888, > > Incline Manometer ❑ Incline Manometer ❑ <br /> Ullage(Capacity minus Volume) 4,764 3,396 8,160 • <br /> > > Magnehelic Guage ❑ Magnehelic Guage <br /> Phase I System Type:2pt EVR Coaxial 0 P W EVR <br /> Digital Manometer ® I Digital Manometer ❑ <br /> Initial Test Pressure(Inches Water)2/0 2.00 Equipment Calibration Date: 4/13/2018 <br /> 2.03 Drift Check End Value: .00 <br /> PSI 1 Minute(Inches Water) Nitrogen Intro.Point: 87 VA <br /> PSI @ 2 Minutes 2.05 Ali <br /> PSI @ 3 Minutes 2.07 Allowable Fill Time 2 scf 521 M <br /> PSI @ 4 Minutes Time 1:2:39 �-( � <br /> 2.09 D s <br /> � <br /> Final Pressure @ 5 Minutes(Inches water) 2.11 Time 2: 0 <br /> 1.87 S C.Q <br /> Allowable Final Pressure(CARB) Time 3: M v <br /> Liquid Removal Check,R c Bac <br /> = <br /> Pressure(if due),an4" aFe <br /> � x <br /> & � <br /> ------- ------- ------- ------- PASS Repairs Are Listed 2. <br />