My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NOWELL
>
26500
>
3500 - Local Oversight Program
>
PR0545613
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 3:39:03 PM
Creation date
4/27/2020 3:33:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545613
PE
3528
FACILITY_ID
FA0005466
FACILITY_NAME
LOPEZ, PAM
STREET_NUMBER
26500
STREET_NAME
NOWELL
STREET_TYPE
RD
City
THORNTON
Zip
95686
CURRENT_STATUS
02
SITE_LOCATION
26500 NOWELL RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOP 6 - EQUIPMENT DECONTAMINATION <br /> Prior to drilling each monitoring-well boring, augers will be steam cleaned. Steam cleaning <br /> will be conducted over plastic and rinsate waters will be retained and transferred to a 55- <br /> gallon drum for storage. <br /> Between soil-sampling attempts, soil samplers will be disassembled and washed in a solution <br /> of low-phosphate laboratory-grade detergent, rinsed with clean water, and reassembled with <br /> clean sample liners to minimize the potential of spreading possible contaminants among <br /> samples. <br /> Prior to groundwater sampling at each well location, well points, casing, Hydropunch <br /> samplers, purge pumps and associated hose will be decontaminated by washing with a low- <br /> phosphate detergent, followed by rinses with tap water. Flushing the pumps and hoses with <br /> hot water and steam will be considered adequate decontamination. <br /> Instrumentation used to measure depth to water and total depth of wells, will be <br /> decontaminated by washing with a non-phosphate detergent and rinsing with tap water. <br /> Instrumentation used to measure pH, temperature, and specific conductance will be rinsed <br /> with de-ionized water after each measurement. <br /> Decontamination procedures and use of decontaminated equipment will be documented in the <br /> field logbook <br /> wpm sora-m00000s-PzMad J=IM SOP 6 -1 <br /> •ssociates <br />
The URL can be used to link to this page
Your browser does not support the video tag.