Laserfiche WebLink
Field Investigation: SSI - Phase One <br /> 1 with a CME 75HT drilling rig using 8-inch The auger flights were steam-cleaned prior to each <br /> diameter hollow-stem augers operated by Mitchell use and the sampling equipment was cleaned with <br /> Drilling Environmental Corp , a Iicensed well a Iaboratory soap and double-rinsed prior to each <br /> driller from Rancho Cordova, California This rig use to minimize the possibility of cross- <br /> was operated in a half-mast mode inside the contamination between samples The borings <br /> 1 forklift shop to drill boring HP-3 As required, were logged under the direct supervision of a <br /> PHS/EHD was notified in writing of the scheduled registered geologist in accordance with the Unified <br /> drilling(HLA, 1998b) and a PHSIEHD Soils Classification System Boring logs are <br /> representative periodically was present onsite to presented in Appendix A Drill cuttings from the <br /> observe drilling and sampling activities during the borings and rinseate, development, and purge <br /> field investigation water were placed in DOT-approved 55-gallon <br /> 1drums, sealed and labeled with the accumulation <br /> Boring HP-1 was advanced to a depth of 21 0 feet date and will be disposed of in accordance with <br /> bgs just east of the former UST excavation (same state environmental and transportation regulations <br /> location as SECOR boring SB-9) At the request <br /> of the PHS/EHD representative, a second boring The lower sleeve of each soil sample was <br /> (HP-Ia)was drilled immediately adjacent to immediately sealed with teflon sheets, plastic end- <br /> boring HP-1 in order to collect a soil sample from caps,and tape, labeled, and placed in a chilled ice <br />' the 5 foot bgs sample depth This was done chest for later transport with a completed chain-of- <br /> because a Hydropunch sample (see below) had custody form to a state certified analytical <br /> been collected in the 3 5 to 7 5 foot depth Interval laboratory Chain-of-custody forms are presented <br /> precluding collection of the soil sample at 5 feet in Appendix D Soil-samples were screened in the <br /> bgs Boring HP-2 was advanced to a depth of 56 field using photoionizing detector(PID)equipped <br /> feet bgs in the center of the former UST with a 10 2 electron volt-rated lamp The PID was <br /> excavation(same location as SECOR boring SB- calibrated on a daily basis to a standard of 100 part <br /> 10) In accordance with the approved scope of per million isobutylene using PID readings are <br /> work, boring HP-2 was advanced beyond the documented on the boring logs PID readings, <br /> proposed depth of 30 feet bgs because field investigation objectives, and subjective field <br /> screening of soil samples suggested the presence criteria such as odor and soil discoloration were <br /> of organic vapors Boring HP-3 was advanced to a utilized to select samples for laboratory analysis <br /> depth of 25 5 feet bgs at a location inside the <br /> forklift shop At the request of onsite PHS/EHD In accordance with the approved scope, <br /> staff, HLA advanced the boring beyond the Hydropunch groundwater samples were collected <br /> proposed depth of 20 feet bgs,to collect an from each of borings (two from HP-1 and HP-2, <br /> additional soil sample and three from HP-2) Hydropunch samples were <br /> collected at depths of 3 5 and 22 0 feet bgs in HP- <br /> SoiI samples were collected at minimum 5 0 foot 1, at 3 5 and 26 5 feet bgs in HP-3, and at 4 5, 22 5 <br /> intervals with a California-modified split spoon and 31 0 feet bgs in HP-2 As previously <br /> sampler fitted with clean brass sleeves Samples discussed, the purpose of the Hydropunch samples <br /> were collected by advancing the boring to a point was to collect depth-specific groundwater <br />' immediately above the sampling depth,then analytical data The samples were collected in <br /> driving the sampler into the native soil through the accordance with the following procedures The <br /> hollow center of the auger The sampler was boring was advanced to just above the <br /> driven 18 inches with a standard 140-pound groundwater table or the designated sampling <br />' hammer dropped 30 inches The number of blows depths and the sampling tool was then pushed <br /> required to drive the sampler each successive 6- approximately 4 to 5 feet into the undisturbed <br /> inch interval was counted and recorded on the formational waters The tool was then retracted <br /> I boring logs to give an indication of soil which exposed approximately 1 to 3 feet of a <br /> consistency disposable dedicated screen,which remained in <br /> the ground The sampling rod at the surface was <br />' disconnected from the rig and a clean stainless <br /> L L300001387371WP`38737N19 Harding Lawson Associates 10 <br />