My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002488
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NOWELL
>
26200
>
3500 - Local Oversight Program
>
PR0545614
>
ARCHIVED REPORTS_XR0002488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 4:23:46 PM
Creation date
4/27/2020 3:47:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002488
RECORD_ID
PR0545614
PE
3528
FACILITY_ID
FA0009531
FACILITY_NAME
UFP Thornton LLC
STREET_NUMBER
26200
STREET_NAME
NOWELL
STREET_TYPE
Rd
City
Thornton
Zip
95686
CURRENT_STATUS
02
SITE_LOCATION
26200 Nowell Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD INVESTIGATION: SSI - PHASE TWO <br /> As previously discussed,the objective of the SSI— with a Mobile B53 drilling rig using 8-inch <br /> Phase Two scope of work was to confirm or refute diameter hollow-stem augers operated by Central <br /> the existence of a deep groundwater plume at the Valley Drilling, a licensed well driller from <br /> Site In addition PHS/EHD requested collection Rancho Cordova, California As required, <br /> and analyses of two additional soil samples The PHS/EHD was notified in writing of the scheduled <br /> SSI—Phase Two scope of work performed drilling(HLA, 1998c)and a PHS/EHD <br /> included the following representative was present onsite to observe <br />' ♦ Drill, log, and sample a soil boring to a depth drilling and sampling activities during the field <br /> of approximately 40 feet bgs near the location investigation <br /> of HP-2 Monitoring well boring MW-7 was advanced to a <br /> • Collect soil samples at 5-foot minimum depth of 415 feet bgs in the center of the former <br /> intervals in each boring UST excavation Soil samples were collected, the <br /> • Analyze soil samples from approximately boring was logged, cuttings were handled, and <br />' 25 and 30 feet bgs TPHg with EPA decontamination procedures were performed as <br /> Method 8015M and for BTEX with EPA described in the section above The soil samples <br /> Method 8020A were analyzed in accordance with the analytical <br />' ♦ Construct monitoring well MW-7 in the soil program described above <br /> boring with a screened interval between 30 <br /> and 40 feet bgs MONITORING WELL CONSTRUCTION <br /> ♦ Develop monitoring well MW-7 after 48 <br /> hours On April 30, 1999,monitoring well MW-7 was <br /> ♦ Purge and sample monitoring well MW-7 after constructed using flush-threaded, 2-mch diameter, <br /> 72 hours Schedule-40 polyvinyl chloride(PVC)casing and <br /> w Analyze the groundwater sample for screen The bottom of the well was fitted with a <br /> TPHg with EPA Method 8015M, for threaded PVC end cap The screened portion of <br /> BTEX with EPA Method 8020,and for each well consists of 0 020-inch wide factory-slots <br /> TBA, MTBE, DIPS, ETBE, TAME,and that extend from approximately 30 to 40 feet bgs <br /> 1,2-DCA with EPA Method 8260B A sand pack of Lonestar No 3 sand extends from <br /> In addition, one complete sampling of all wells the bottom of the well to two feet above the top of <br /> was performed and samples were analyzed in the screened interval corresponding to a depth of <br /> accordance with the approved analytical program 28 feet bgs A two-foot-thick bentonite chip seal <br /> (28 feet bgs to 26 feet bgs)was placed above the <br /> Prior to the initiation of any onsite sampling sand pack and hydrated for at least 30 minutes <br /> activities, Underground Service Alert(USA)was prior to backfilling the remaining annular space <br /> notified to trace existing public utilities present at with a slurry of neat cement and powdered <br />' the site A site specific Health and Safety Plan, bentonite to a depth of one foot bgs The well was <br /> prepared consistent with the requirements of Title completed with a locking expansion cap, a traffic- <br /> 8 CCR 5192 was present onsite and all field work rated well box with a rubber seal, and with the <br /> was conducted in accordance with the plan well box set slightly above grade to prevent <br /> ponding of surface water over the well The <br /> MONITORING WELL BORING AND SOIL construction details for well MW-7 are <br /> SAMPLING documented on the boring log(Appendix A) <br /> Monitoring well boring MW-7 was drilled on <br /> April 30, 1999 at the same location as boring HP- <br /> 2, as shown on Plate 3 The boring was advanced <br />' L U00001387371wP\38737N19 Harding Lawson Associates 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.