Laserfiche WebLink
1 <br /> PAGE 1 OF <br /> BORING HAI <br /> DATE DRILLED 02/10/95 <br />' 1 SAMPLE INTERVAL <br /> BORE HOLE LOG ! WATER <br />' <br /> PROJECTTRI-VALLEY GROWERS (TVG) GEOLOGIST I SURFACE appror <br /> ROY BUTLER I ELEVATION 10' <br /> LOCATION26200 NOWELL ROAD � DRILLER 1 TOTAL DEPTH <br /> THORNTON, CA 95636 ROY BUTLER 15 5' <br /> DRILLING CONTRACTOR DEPTH TO6 2' ROSE ICASING NONE <br /> WESTERN GEO-ENGINEERS WATER TO 6 04' <br />' REMARKS BORING DRILLED, WITH 4 5" HAND AUGERS DRILL ORIGANAL BORING TO <br /> 5', HIT TREE ROOT, MOVED BORING 1', AUGERED BORING TO 15 5' <br /> Z LL o <br /> = _j c' CORE DESCRPTION REMARKS <br /> b— Il o <br /> � i <br /> IJ <br /> C: I <br /> © cn m n LD <br /> tA_ sit dark grey brawn clayey,tumor fine sand <br /> 5 "�jAi-s2Ppn <br /> Water rase to 6 04 bgs <br /> sanpla with new <br /> dmcwb1 baler tread <br /> 2pM CL dark gray brown,soft plastic wet <br /> space haler"2PPm <br /> 1 <br /> Flat- 125 tem Strong gascilne odor <br /> CL. try dark brown silty plastic sticky strong detected in augered soil <br />' gasoline odor <br /> I S H41-1 155 15op n own very clayey silly Ire-as <br /> TOTAL DEPTH a 15 5 feet <br /> ED <br /> E <br /> 20 NAPPER <br /> �r <br /> PN4o 3037 <br /> OF C <br /> i <br /> i <br /> 1 <br />