Laserfiche WebLink
Is the primary tank free of water or has another preventative measure been taken? <br /> 4 NOTE:Refer to paragraphs 6.10 and 6.11 of the standards for alternatives for Category 1 tanks.N/A is ❑Yes❑No ❑N/A <br /> only appropriate for these alternatives. <br /> 5 For double-wall or double bottom tanks or CE-ASTs, is interstitial monitoring equipment(where ❑Yes❑No ❑N/A <br /> applicable)in good working condition? <br /> 6 For double-wall tanks or double bottom tanks or CE-ASTs,is interstice free of liquid?Remove ❑Yes❑No ❑N/A <br /> the liquid if it is found.If tank product is found,investigate possible leak. <br /> Equipment on tank <br /> 7 If overfill equipment has a "test' button, does it activate the audible horn or light to ❑Yes❑No ❑N/A <br /> confirm operation?If battery operated,replace battery if needed. <br /> 8 Is overfill prevention equipment in good working condition?If it is equipped with a mechanical test ❑Yes❑No ❑N/A <br /> mechanism,actuate the mechanism to confirm operation. <br /> 9 Is the spill container(spill bucket)empty,free of visible leaks and in good working condition? ❑Yes❑No ❑N/A <br /> Are piping connections to the tank(valves,fittings,pumps,etc.)free of visible leaks? <br /> l0 Note:If'No" identify location and describe leak. ❑YeS ii NO <br /> 11 Do the ladders/platforms/walkways appear to be secure with no sign of severe corrosion or damage? ❑Yes❑No ❑N/A <br /> Containment(Diking/Impounding) <br /> 12 Is the containment free of excess liquid,debris,cracks,corrosion,erosion,fire hazards and other integrity ❑Yes❑No ❑N/A <br /> issues? <br /> 13 Are dike drain valves closed and in good working condition? ❑Yes❑No ❑N/A <br /> 14 Are containment egress pathways clear and any gates/doors operable? ❑Yes❑No ❑N/A <br /> Concrete Exterior AST(CE-AST) <br /> 15 Inspect all sides for cracks in concrete.Are there any cracks in the concrete exterior larger than 1/16"? ❑Yes❑No ❑N/A <br /> 16 Inspect concrete exterior body of the tank for cleanliness,need of coating,or rusting where applicable. ❑Yes❑No ❑N/A <br /> Tank exterior in acceptable condition? <br /> 17 Visual inspect all tank top openings including nipples,manways,tank top overfill containers,and leak ❑Yes❑No ❑N/A <br /> detection tubes.Is the sealant between all tank top openings and concrete intact and in good condition? <br /> Other Conditions <br /> 18 Is the system free of any other conditions that need to be 240 Doak Boulevard for ❑Yes ❑No <br /> continued safe operation? <br /> Monthly Checklist Page 2 of 3 <br />