My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DOAK
>
240
>
2800 - Aboveground Petroleum Storage Program
>
PR0528648
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 4:29:11 PM
Creation date
4/27/2020 4:07:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0528648
PE
2832
FACILITY_ID
FA0019249
FACILITY_NAME
RIPON FUEL FACILITY
STREET_NUMBER
240
STREET_NAME
DOAK
STREET_TYPE
Blvd
City
RIPON
Zip
95366
APN
25933015
CURRENT_STATUS
01
SITE_LOCATION
240 Doak Blvd
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Are all valves free of leaks, corrosion and other damage? <br /> Follow manufacturers' instructions for regular <br /> maintenance of these items.Check the following and verify <br /> (as applicable): <br /> ❑Anti-siphon valve ❑Yes❑No ❑N/A <br /> 16 o Check valve ❑Yes❑No ❑N/A <br /> ❑Gate valve ❑Yes❑No ❑N/A <br /> ❑Pressure regulator valve ❑Yes❑No ❑N/A <br /> ❑Expansion relief valve ❑yes❑No ❑N/A <br /> ❑Solenoid valve <br /> ❑Fire valve ❑Yes❑No ❑N/A <br /> ❑Shear valve ❑Yes❑No ❑N/A <br /> 17 Are strainers and filters clean and in good condition? ❑Yes ❑No ❑N/A <br /> Insulated Tanks <br /> Free of missing insulation? ❑Yes ❑No ❑N/A <br /> 18 Insulation free of visible signs of damage? <br /> Insulation adequately protected from water intrusion? <br /> 19 Insulation free of noticeable areas of moisture? ❑Yes ❑N o ❑N/A <br /> 20 Insulation free of mold? ❑Yes ❑No ❑N/A <br /> 21 Free of visible signs of coating failure? ❑Yes ❑No ❑N/A <br /> Tank/Piping Release Detection <br /> 22 Is inventory control being performed and documented if ❑Yes ❑No ❑N/A <br /> required? <br /> 23 Is release detection being performed and documented if ❑Yes [:]No ❑N/A <br /> required? <br /> Other Equipment <br /> 24 Are electrical wiring and boxes in good condition? []Yes ❑No ❑N/A <br /> Has the cathodic protection system on the ❑Yes ❑No ❑N/A <br /> 25 tank been tested as required by the <br /> designing engineer? <br /> Annual Checklist Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.