My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986 - 1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_1986 - 1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 10:14:57 AM
Creation date
4/28/2020 9:10:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1994
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Idarns <br /> recision <br /> nstrumentation, Co. <br /> 3031 TISH WAY,SUfTE 200-SAN JOSE,CALIFORNIA 95128 <br /> (408) 244-6739- FAX(408)244-6801 <br /> ARCO Products Company <br /> API/Ronan X76S Leak Detection Certification <br /> Facility # �Do7� Date <br /> Address <br /> I Verify Intrinsic Safety <br /> Proper field wire termination <br /> Proper power wiring with earth ground and individual breaker <br /> Complete isolation of I.S. field wiring from any other wiring <br /> especially in gutters <br /> Proper use of E.Y.S. fitting/ <br /> II. Check for proper panel installat on <br /> Panel mounted in a nonhazarAo s to /In <br /> Panel is accesible to station ope a 'o�s <br /> All field wiring is tabellel t na strip or adjacent gutter <br /> All wiring to panel is Brough r u h a propriate punch-outs <br /> III Check for proper probe installation <br /> Piping sump sensors suspended within one inch of sump bottom <br /> Double walled FRP tank sensors(LS-7) installed at bottom of tank <br /> with a pull wire circumventing the primary tank and accessible <br /> from grade. <br /> Annular space risers should be sealed watertight with field <br /> wiring penetrating using cable grips or other apprpriate method <br /> Probe leads terminating in a watertight J-box <br /> IV Check system operation <br /> Verify proper fuctioning of alarm horn and lights by pushing <br /> the test button <br />
The URL can be used to link to this page
Your browser does not support the video tag.