Laserfiche WebLink
Ray, chem <br /> Adrienne Klopack Raychem Corporation <br /> Regional Sales Manager TraceTek' Products Group <br /> 300 Constitution: C)rivo <br /> Menlo Park, CA W25-1164 <br /> 41513616209 <br /> TAX 415/36139,.4 <br /> `IracctekR Multiple-chwuiel Alarm Systeii <br /> Facility t � � Datc <br /> Address <br /> i verify- ict:insic safety <br /> Proper field wire termination <br /> Proper power wiring with rth ground rid dividual breaker <br /> Complete isolation of I_ fiJon <br /> fr m ani of er wiring <br /> especially in gutters <br /> Proper use of E.Y .S. fi in s <br /> II. Check for proper panel ins all t <br /> Panel mounted in a nonh zar on <br /> Panel is accesible to �tatio� <br /> All field wiring is Imbelledi <br /> tor <br /> All or adjacent gutter <br /> All wiring to panel is broughappropriate punch-outs <br /> t <br /> �II Check for proper probe installat <br /> Piping sump sensors suspended within one inch of sump bottom <br /> Double walled FRP tank sensors(LS-7) installed at bottom of tank <br /> with a pull wire circumventing the primary tank and accessible <br /> i <br /> from grade. <br /> i Annular space risers should be sealed watertight with field <br /> wiring penetrating using cable grips or other apprpriate method <br /> Probe leads terminating in a watertight J-box <br /> ' IV Check system operation <br /> _Verify proper fuctioning of alarm horn and lights by pushing <br /> the test button <br />