My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986 - 1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_1986 - 1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 10:14:57 AM
Creation date
4/28/2020 9:10:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1994
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING & RESPONSE PLAN- III <br /> ARCO PRODUCTS COMPANY FACILITY WITH <br /> SINGLE WALL TANKS AND SINGLE WALL LINES <br /> ARCO Facility l�f� /ry Address 0S n � <br /> 1 . DETECTION METHOD <br /> Tanks - Monthly Inventory Reconciliation and Annual Tank Integrity Testing in accordance <br /> with Sections 2646 and 2643(c)(2)(A) and (B), Article 4, Title 23, CCR. <br /> Lines - Automatic Pressure Line Leak Detectors and Annual Line Tightness Testing in <br /> accordance with Section 2643 (d)(1) and (3), Article 4, Title 23, CCR. <br /> 2 . MONITORING EQUIPMENT <br /> The Automatic line leak detectors will be maintained and inspected according to the <br /> manufacturer's instructions by an outside contractor once during each calendar year. <br /> 3 . MONITORING PROCEDURE - Inventory Reconciliation <br /> Inventory reconciliation will be performed in compliance with the details of Section 2646, <br /> Article 4, Title 23, CCR (copy attached and hereby incorporated). <br /> k The daily variation in inventory reconciliation shall be the difference between <br /> physically measured inventory in storage and the calculated inventory in storage. <br /> B. The physically measured inventory shall be determined at approximately the same time <br /> each day by taking liquid level measurement (stick reading) and converting it to <br /> gallons using a calibration chart. <br /> CL The calculated inventory shall be determined at approximately the same time of day for <br /> each business day by adding the inputs and subtracting the withdrawals from the <br /> physically measured inventory determined the day before. <br /> D. These variations shall be summed for a period of one month. Monthly variations <br /> exceeding a variation of 1.0 percent of the monthly tank delivery plus 130 gallons <br /> must be investigated in accordance with instructions attached. <br /> See Exhibit A for reconciliation form. <br />
The URL can be used to link to this page
Your browser does not support the video tag.