Laserfiche WebLink
ARCO 6020 <br /> RELEASE *112610 PER COURTLAND <br /> INVOICE *17163 <br /> 03-25-91 <br /> 16 Hours labor @ $38. 00 an hour for two men to install red jacket <br /> gasket set and apply helium test to regular fuel tank. Removed <br /> plastic tubing and plastic tee on regular vapor line under <br /> dispensers and replaced with steel fittings and fuel hose. Checked <br /> out emergency shut-off switch. Found switch will shut off all <br /> dispensers but appears not to shut off the unleaded turbine. Need <br /> more time to trouble shoot. Will coordinate with station to have <br /> supplies moved out of the way to allow access to equipment. <br /> 03-29-91 <br /> 13 hours labor @ $38. 00 an hour for two men to trouble shoot and <br /> repair emergency shut-off switch. <br /> QTY. DESCRIPTION AMOUNT ' <br /> 1 RJ GASKET SET 12. 50 <br /> 1 DAY RENTAL-HELIUM LEAK <br /> DETECTION SYSTEM 150. 00 <br /> 2 BOTTLE OF HELIUM 69. 10 138. 20 <br /> 2 3/4" TEE 1. 87 3. 74 <br /> 4 3/4" HOSE BARB 1. 17 4. 68 <br /> 4 HSS-12 CLAMP 1. 04 4. 16 <br /> 4 3/4" FUEL HOSE 1. 60 6. 40 <br /> 1 MISC. ELECTRICAL 5. 00 <br /> 1 EMERGENCY SHUT-OFF SWITCH 43. 78 <br /> 1 POWER RELAY 22. 54 <br /> MATERIALS 391. 00 <br /> TAX 23. 46 <br /> LABOR 1102. 00 <br /> TOTAL: 1516. 46 <br />