My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
935
>
3500 - Local Oversight Program
>
PR0545617
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 1:24:47 PM
Creation date
4/28/2020 12:51:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545617
PE
3528
FACILITY_ID
FA0005557
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
935
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/2011
CURRENT_STATUS
02
SITE_LOCATION
935 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22871 South Highway 99 <br /> Page 2 of 2 <br /> COMMENTS AND CONDITIONS: <br /> 1. To prevent cross contamination between possibly two different sand layers located at 30 and 40 feet <br /> bsg,soil borings will be advanced to a total depth of 35 feet instead of 40 feet bsg. <br /> 2. The three monitoring wells will be screened between the intervals of 15 and 35 feet bsg instead of 20 k <br /> to 40 feet bsg. '1 <br /> 3. Obtain and provide a copy of the encroachment permit from the City of Ripon to the Environmental i <br /> Health Department(EHD)for the two proposed off-site monitoring wells. <br /> 4. Submit a drilling permit application for each parcel with the 589.00 fee for each application to EHD. <br /> 5. Notify EHD at least 72 hours prior to the proposed scheduled fieldwork. <br /> 6. Submit a site-specific health and safety plan to EHD prior to commencement of the fieldwork. <br /> Ir , <br /> f <br /> 7. Complete the fieldwork by March 25,2005. <br /> 8. Submit the well installation report ort to EHD within eight weeks of completing the fieldwork. i <br /> 9. EHD does not approve analyzing selected soil samples for the geotechnical parameters of intrinsic <br /> permeability,moisture content,porosity,and total organic carbon,unless EHD receives clarification I <br /> of the objectives for obtaining this information and concurs with the objectives. <br /> DATED: January 11,2005 BY: <br /> c: CVRWQCB—James L. L.Barton <br /> Advanced GeoEnvironmental,Inc.--William Little i <br /> a <br /> It <br /> ii <br /> I, <br /> s, <br /> III I <br /> i� <br /> 3i <br /> �1 <br /> 1 <br /> i <br /> .r <br /> n <br /> E <br /> I� <br />
The URL can be used to link to this page
Your browser does not support the video tag.