My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
935
>
3500 - Local Oversight Program
>
PR0545617
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 1:24:47 PM
Creation date
4/28/2020 12:51:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545617
PE
3528
FACILITY_ID
FA0005557
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
935
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/2011
CURRENT_STATUS
02
SITE_LOCATION
935 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case Closure Summary Page 2 . <br /> Leaking Underground Fuel Storage Tank Program <br /> III Release and Site Characterization Information (continued) <br /> Maximum Documented Contaminant Concentrations -- Before and After Cleanup <br /> .I <br /> Contaminant Soil (ppm) Water (ppm) Contaminant Soil (ppm) Water (ppm) <br /> Before After Before After Before After Before After <br /> TPH (Gas) 3,800 <1.0 6:7 <0.050 Xylenes 8.4 <0.005 0.350 <0.0006 <br /> TPH (Diesel) 280 1,300 39 <0.050 MTBE NA <0.005 <0.001 <0.001 <br /> Benzene 1.4 <0.005 0.023 <0.0005 1,2-DCA NA <0.005 0.021 <0.0005 <br /> Toluene 0.21 <0.005 0.0037 <0.0005 EDB NA <0.005 <0.001 <0.0005 <br /> Ethylbenzene 7.4 <0.005 0.290 <0.0005 <br /> 1 <br /> Comments: Soil Before concentrations are taken from B-4 at 20 feet bsg collected on 04127194. Soil After data are taken <br /> from CB-2 at 20 feet bsg collected on 10/14103. Water Before concentrations are.taken from MW-1 collected on 11/07/00 <br /> except 1,2-DCA and EDB are taken from 10104101. Water After concentrations are taken from MW-1 on 02112109. NA-- <br /> not analyzed <br /> IV. Closure <br /> Does completed corrective action protect existing beneficial uses.per the Regional'°Board Bas+n Plan? Yes <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan? Yes <br /> Does corrective action protect public health for current land use? Yes <br /> Site management requirements: None <br /> Should corrective action be reviewed if land use changes? Yes <br /> MonitoringNapor wells decommissioned: Yes Number Decommissioned: 6MWs, 11VWs, 4 IAS wells Number retained: 1 <br /> MW-5 retained;b the Water Bd. for nitrate monitoring <br /> List enforcement actions taken: NOR <br /> I - . . <br /> List enforcement actions rescinded: None <br /> V. Local Agency Representative Data. <br /> Name: Donna Heran, RENS Title: Director <br /> Signature. Date: April.;19, 2012 <br /> VI. Central Valley Regional Water Quality Control Board (RB) Notification <br /> Date Submitted to RB: October 18, 2011 Response"Date.: November 1, 2011 <br /> RB Staff. James Barton, PG Response: Concurrence <br /> Title Engineering Geologist <br /> VII Additional Comments, Data, etc. <br /> This document and the CASE CLOSURE LETTER shall be retained by the lead agency as part of the official site file. <br />
The URL can be used to link to this page
Your browser does not support the video tag.