CHRONOLOGY <br /> Ripon Farm Service Incorporated <br /> 932 South Highway 99 East Frontage Road, <br /> Formerly 22871 South Highway 99 <br /> Ripon, California 95366 <br /> 06/15/87 Date when two 10,000-gallon and one 7,500-gallon diesel, and one 10,000- <br /> gallon gasoline underground storage tanks (USTs) were removed from the site <br /> under permit issued by the San Joaquin County Environmental Health <br /> Department (EHD). Documentation of the UST removal and analytical data of <br /> samples collected during the UST removal are available in the Unit IV files. <br /> 02/08/94 Date the EHD filed Unauthorized Release Form (URF) No. 94-Ull and <br /> Notification of Hazardous Waste Discharge No. 94-028. These documents are <br /> available in the Unit IV files. <br /> 04/06/94 Date of Preliminary Site Assessment Work Plan submitted by Geological Audit <br /> Services, Inc., proposing the advancement of four soil borings and converting <br /> one or more of the soil borings into monitoring wells if petroleum hydrocarbon <br /> contamination were detected in the grab groundwater samples collected from the <br /> soil borings. The work plan is available in the Unit IV files. <br /> 04/19/94 Date of letter from the EHD informing the responsible party of his/her <br /> responsibility to perform corrective action, and the placement of the site into the <br /> Local Oversight Program (LOP). The letter is available in the Unit IV files. <br /> 04127-28194 Dates when soil borings 61 through B8 were advanced and soil boring B1 <br /> through B3 were completed as monitoring wells MW-1 through MW-3. <br /> 06/23/94 Date of Monitoring Well Installation and Sampling submitted by Geological Audit <br /> Services, Inc. describing the installation of MW-1 through MW-3 and the <br /> advancement of soil borings B4 through B8. The report is available on Questys, <br /> file XR0005909. <br /> 02/13/95 Date of Interim Work Plan submitted by Geological Audit Services, Inc., <br /> proposing the installation of two additional monitoring wells onsite, and based on <br /> the field screening results, possibly advancing one additional soil boring onsite, <br /> and the advancement of two soil borings offsite at the Jimco Truck Plaza <br /> property. The work plan is available in the Unit IV files. <br /> 08/14/95 Date when soil borings B9 through B13 were advanced at the site and B9 and <br /> B11 were completed as monitoring wells MW4 and MW-5, respectively. <br /> 09/25/95 Date of Quarterly Report — August 1995 submitted by Advanced <br /> Geo Environmental, Inc. that described the advancement of soil borings B9 <br />