Laserfiche WebLink
Ripon Farm Service Incor[f1!Yr)ated Page 3 <br /> 932 South Highway 99 East Frontage Road October 18, 2011 <br /> Ripon, California 95366 <br /> 01/20/00 Date of Remedial Action Work Plan submitted by Advanced GeoEnvironmental, <br /> Inc. that proposed the design of an SVE/IAS remediation system that included <br /> the installation of 6 SVE wells and 12 IAS.; wells, and proposed°that after 12 <br /> months of operating the SVE/IAS system, soil confirmation samples would be <br /> collected in the area most impacted by petroleum hydrocarbon contamination. <br /> The work plan is available on Questys, file XR0005807. <br /> 03/10100 Date of Remedial Action Work Plan Addendum submitted by Advanced <br /> GeoEnvironmental, Inc. that specified corrective action requirements that <br /> included a list of clean-up goals for groundwater using the SVE/IAS system and <br /> estimated the volume of soil to be remediatea by the SVE/IAS system to be 645 <br /> cubic meters. The addendum is available in the. Unit IV files. <br /> 04/10/00 Date of Revised Addendum for Remedial'l Action Work Plan submitted by <br /> Advanced GeoEnvironmental, Inc. proposing the advancement of four soil <br /> borings to further assess the soil type prior to and in conjunction with the <br /> installation of the proposed IAS wells, collection .of soil samples in the source <br /> area following twelve months of operating the SVE system to determine the <br /> effects of SVE/IAS,. and performance of a drawdown test to assist in determining <br /> whether operation of the well at the Jimco Truck .Plaza facility can potentially <br /> induce vertical migration of the petroleum hydrocarbon plume toward the Jimco <br /> facility well screen. The work plan is.available''in the'.-Unit IV files. <br /> 04125-27100 Dates when four IAS wells (IAS1 through IAS4) and 11 SVE wells (VW3A/B, <br /> VW4 through VW8, VW9A/B, VW10 and VW11) were installed at the site. <br /> 11/27/00 Date when the installation of the SVE system was begun. <br /> 12/05/00 Date when the SVE system began operation. <br /> 06/08/01 Date of Remediation System Installation and Start-up Report submitted by <br /> Advanced GeoEnvironmental, Inc. that described the`installation of four IAS wells <br /> and 11 SVE wells, and the installation and start up of the SVE system. <br /> 10114-17/03 Dates when soil borings CB-1 through CB-5 were advanced to collect soil and <br /> groundwater samples to evaluate the effects of the SVE system in reducing <br /> petroleum hydrocarbon contaminant concentra#ions at the site. <br /> 01/05/04 Date of Quarterly Report -- Fourth Quarter 2003 submitted by .Advanced <br /> GeoEnvironmental, Inc. that documented the advancement of Geoprobe borings <br /> CB-1 through CB-5 and presented the soil and groundwater analytical results <br /> from the investigation. The report is available on Questys, file XR0005857. <br /> 05/14/04 Date of Quarterly Report — First Quarter` 2004 submitted by Advanced <br /> GeoEnvironmental, Inc. that documented the.'termirsation of operating the SVE <br /> system in January 2004 following a malfunction of.the equipment. The SVE <br /> system was not restarted since contaminants of concern were not detected in the <br /> soil vapor samples collected during the fourth quarter. 2003 monitoring event. <br /> The report is available on Questys,.file XR0005855. <br />