Laserfiche WebLink
1 <br /> TABLE OF CONTENTS <br /> Page <br /> I.O. INTRODUCTION AND SCOPE OF WORK 1 <br /> 2.0. BACKGROUND I <br /> 21 SITE LOCATION 1 <br /> 2 2 UNDERGROUND STORAGE TANK REMOVAL 1 <br /> 23 ASSESSMENT OF HYDROCARBON-IMPACTED <br /> SOIL AND GROUND WATER 1 <br /> 1 30. PROCEDURES 2 <br /> 31 MONITORING WELL PURGE PROCEDURES 2 <br /> 3 2 GROUND WATER SAMPLE COLLECTION 2 <br /> 40 FINDINGS 2 <br /> 41 GROUND WATER GRADIENT AND DIRECTION 2 <br /> 4 2 PETROLEUM HYDROCARBON-IMPACTED GROUND WATER 3 <br /> 50 CONCLUSIONS AND RECOMMENDATIONS 3 <br /> 60 LIMITATIONS 4 <br /> FIGURES <br /> ' <br /> Figure 1 -Location Map <br /> P <br /> Figure 2 - Site Plan <br /> Figure 3 -Relative Ground Water Elevation <br /> ' TABLES <br /> Table 1 - Relative Ground Water Elevations <br /> Table 2 -Analytical Results of Ground Water Sample <br /> APPENDICES <br /> Appendix A -Monitoring Well Data Sheets <br /> Appendix B -Analytical Results of Ground Water Samples <br />