r <br /> E. <br /> Tuleburg Warehouse -2- August 31, 2001 <br /> Claim No. 012586 <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Task* Amount Pre-Approved Comments <br /> 1 Permitting and Regulatory Liason $790 <br /> $1,580 was submitted in the <br /> previous cost estimate. $790 of the <br /> $1,580 was approved in the May <br /> 31, 2001 Pre-Approval letter. <br /> 2 Install Water Supply Well to 330' $24,992 <br /> 3 Sample Newly InstaJJed Well <br /> 4 Well Abandonment& Sampling $p A total of$6,659 was approved in 4 <br /> the May 31,2001 Pre-Approval <br /> letter. <br /> 5 Report Preparation and Submital $1,350 <br /> 6 Project Management/Regulatory $970 <br /> Liason <br /> I <br /> TOTAL PRE-APPROVED $29,046 <br /> * Task descriptions are the same as those identified in Ground Zero Analysis,Inc.August 17,2001 cost estimate. <br /> i <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The Fund will <br /> review any tasks/costs that go beyond the pre-approved amount to be determined if the <br /> additional tasks and costs are necessary and reasonable. However, if costs exceed the above <br /> pre-approved amounts, the Fund will be unable to expedite your Reimbursement Request. <br /> • The work products must be acceptable to the Regional Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the Ground Zero Analysis, Inc. proposal in my pre-approval <br /> above, please be aware that you will be entering into a private contract: the State of <br /> California cannot compel you to sign any specific contract. This letter pre-approves the <br /> costs as presented in the proposal dated August 17, 2001 by Ground Zero Analysis, Inc. for <br /> conducting the work approved by the Regional Board for implementing the December 4, <br /> 2000, Ground Zero Analysis , Inc. workplan. <br /> submit the actual costs of the work as explained in <br /> Please remember that it is still necessary to s p <br /> asY <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required breakdown of costs on a time and materials basis, that <br /> Calilornig En vironmen&1 Fz-ytection Agency <br /> Q)RecycIedF.per <br />