My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/28/2020 1:57:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a i <br /> r 1 <br /> Tuleburg Warehouse -2- May 3l, 2001 <br /> Claim No. 012586 <br /> because it is unnecessary, then you must provide a written request for waiver of the three-bid <br /> requirement and resubmit your pre-approval request seeking only the amounts specified in Table <br /> 1. In an effort to assist you in expediting the pre-approval process we have prepared the attached <br /> Acceptance of Reasonable Cost/Request for Bid Waiver form letter. If you concur/accept our <br /> reasonable cost determination and would like to request a bid waiver, then just sign and date the <br /> attached letter and return to us for further processing your Pre-Approval. <br /> Table 1 <br /> REASONABLE COST BREAKDOWN <br /> # Task* Reasonable Cost $ Comments/Changes <br /> 1 50 percent of proposal costs <br /> withheld at this time since only the <br /> Permitting and Regulatory Liaison $ 790 well abandonment and sampling <br /> task has pre-approval. <br /> 4 Well Abandonment and Sampling $6,659 <br /> 5 50 percent of proposal costs <br /> withheld since only the well <br /> Report Preparation and Submittal $1,140 abandonment task has pre- <br /> approval <br /> 2 Costs for this task are withheld <br /> since installation of the well is not <br /> Install Water Supply Well $ 0 related to corrective action/cleanup <br /> of the site. <br /> 3 Costs for this task are withheld <br /> since these costs are not related to <br /> Sample Newly Installed Well $ 0 corrective action/cleanup of the <br /> site. <br /> TOTAL Reasonable Cost $ 8,589 <br /> * Task descriptions are the same as those identified in Ground Zero Analysis, Inc.'s May 1, 2001 Cost Estimate <br /> Should you decide to obtain the additional bids for satisfying the three-bid requirement, and if <br /> you need assistance in procuring contractor and consultant services for corrective action don't <br /> hesitate to call me at (916) 341-5674. <br /> Sincerely, <br /> Guy Childs, Associate Engineering Geologist <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> California En vironmeatal Protection Agency <br /> 2t1 Recycled PAper <br />
The URL can be used to link to this page
Your browser does not support the video tag.