Laserfiche WebLink
FILE <br /> GROUND ZERO ANALYSIS,ENC- <br /> 1714 <br /> NC.-1714 Nbin Street — <br /> Deaion,California 95320-1927 <br /> Telephone:(209)$38-9888 <br /> Facsimile.(209)838-9$83 <br /> lSby 26,2000 <br /> Mr.Ray Basuetto <br /> Mr.Frank Rauzi <br /> 301 S.Aurom Street <br /> Stocld=6 CA 95203 <br /> Subject: Pian and Schedule to Replace Water Supply <br /> Speedy Mart,8200 N.I-tgltway 99,Morada,CA <br /> Bear Sirs: <br /> This letter is submitted to present a plan and schedule to replace the water supply at Speedy Mart pursuant <br /> to correspondence dated May 16, 2000 from the California, Regional Water Quality Control Board, <br /> Central Valley Region(CRWQCB). <br /> Ground Zero proposes the following schedule to replace the existing water supply at the Speedy Mart: <br /> Task 1. Water from the existing supply well is not currently used for drinking water. Bottled drinking <br /> water has been supplied to the facility for some time due to previous concerns of bacteria in the <br /> well. <br /> Task 2. Solicit and review bids from drilling contractors to replace existing water supply well. The <br /> review process sbould be completed by June 30,2000. <br /> Task 3, Select a contractor to complete installation of a new well and destroy the existing well. Well <br /> specifications and a location will be reviewed with San Joaquin County Public Hcalth Services <br /> to ensure compliance with all local ordinances. This task should be completed by July 31, <br /> 2000. <br /> Task 4. Install-and,put into service the new-water supply.well-by=August 15;-2000. <br /> Task 5. Abandon and destroy existing water-supply-well-6y August 31,2000. <br /> Please call me at(209) $38-9888 if you have any questions regarding this submittal. <br /> Sincerely, <br /> dam, <br /> John P. Lane <br /> CA Registered Geologist No. 6795 <br /> JPL <br /> Ed W&E:2O 0002 9Z 'F-ew R886 e2e 60Z : 'ON 3NOHd s!sR I Pub o.aaZ punoarg WONA <br />