My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/28/2020 1:57:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Rauzi -2- August 18, 1999 <br /> COST PRE-APPROVAL BREAKDOWN <br /> Task Amount Pre-Approved Comments <br /> Workplan, Site Safety Plan $0 Costs for these tasks are deducted from the <br /> and permitting requested pre-approval amount. These tasks <br /> had been completed. <br /> Labor and materials $26852 Includes drilling boreholes and conversion <br /> to monitoring wells, well development, <br /> decon equipment, removal and replacement <br /> of pump, video log production we]I, <br /> collection of samples. Rental costs for <br /> equipment was calculated and reduced on a <br /> weekly basis instead of a daily basis. <br /> Lab analyses $4463 <br /> Report preparation $2000 Proposed costs are much higher than Fund <br /> staff would expect to see and have been <br /> reduced accordingly. <br /> TOTAL PRE-APPROVED $33,315 <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it <br /> to remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. . <br /> • It is my opinion that it is unnecessary to obtain three bids for this scope of work; the Fund's <br /> three bid requirement is waived for this scope of work. <br /> • if a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the Ground Zero Analysis, Inc proposal in my pre-approval <br /> above, please be aware that you will be entering into a private contract: the State of <br /> California cannot compel you to sign any specific contract. This letter pre-approves the <br /> costs as presented in the proposal dated August 4, 1999 by Ground Zero Analysis, Inc for <br /> conducting the work approved by the County for implementing the June 30, 1999 Ground <br /> Zero Analysis, Inc workplan. <br /> California Environmental Protection Agency <br /> Recycled Paper <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.