My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/28/2020 1:57:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRGLIETTO SEEDS Fax:209-466-6377 Sep 18 '98 1.2:44 P.43/43 ' <br /> .�' <br /> Tuleburg Warehouse <br /> Attn: R Rauzi -2- <br /> • if a different scope of work becomes necessary,then you must request pre-approval of costs on the new <br /> scope of work. <br /> • Please be awarc that you will be entering into a private contract: the State of califomia cannot compel you <br /> to sign any specific contract or use any specific contractor. This letter pre-approves the costs as presented in <br /> Jim Thorpe Oil, Inc.'s proposal dated June 15, 1948 and JJW Geosciences Inc.'s proposal dated June 11, <br /> 1998 for conducting the corrective action work approved by the SJCEHD. <br /> I <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> to confirm that the costs are consistent with this pre-approval before you <br /> will be reimbursed. To make this easier,insure that your consultant prepares his invoices to match the format <br /> of the original estimate,end provides reasonable explanations for any changes made in the scope of work or <br /> increases in the costs. When the invoices are submitted you must include copies of all: <br /> a subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the SJUM <br /> Please call if you have any questions; I can be reached at(916)227-2505. <br /> Sincerely, <br /> Douglas A.Roderick <br /> r water Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc: <br /> Mr.William J Hunter <br /> WM_J_Hunter&Associates <br /> 2220 Loma Vista Drive <br /> Sacramento,CA 95825 <br /> i� <br /> catifornia Environmentat Protection Agency <br /> Rft.)Tw Paper <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.