My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/28/2020 1:57:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• San Joaquinucy Air Pollution Control District <br /> y J <br /> Page 8 <br /> the theoretical rate of extraction. Vapor concentrations are expected to decline rapidly and the <br /> operational period will be longer than this before cleanup is complete. We anticipate operation of <br /> the vapor extraction system for a minimum of six months. <br /> INFORMATION FOR PUBLIC NOTICE <br /> Ground Zero personnel conducted a phone book, map and internet search for public and private <br /> schools and day cares within a 1;000 foot radius of the subject property. None were found. The <br /> closest school to the site is Davis School, which is located approximately 5,000 feet northeast of the <br /> site. The nearest residence to the subject property is a single story home located approximately 340 <br /> feet north-northwest of the proposed emission point. <br /> COMPLIANCE SOURCE TESTING <br /> Once we have received the Authority to Construct, the conveyance lines and system compound will <br /> be constructed and the vapor extraction system and thermal/catalytic oxidizer will be installed. We <br /> will notify the District at least 15 days prior to conducting the initial compliance source tests. <br /> If you have any questions or require additional information regarding this application, please call <br /> Ground Zero at your earliest convenience. <br /> Respectfully, <br /> Ground Zero Analysis, Inc. <br /> Joseph L. Vasquez <br /> Staff Geologist <br /> John P. Lane <br /> CA Registered Geologist 6795 <br /> Enclosure 1: Check 9014048 in the amount of$60.00 <br /> Enclosure 2: Permit Application, Supplemental Form for Soil and Groundwater Remediation, <br /> and Supporting Documentation, Figures <br /> cc: Mr. James Barton <br /> Mr. Ray Baglietto/Mr. Frank Rauzi <br /> Mr. David Irey <br /> Mr. Lee Roy Pierce, Jr., <br /> Mr. Jeffrey Wong <br /> GAGROUNDZE1TULEBURG\Vapor Extraction permitsWEScvrltr.DOC <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.