Laserfiche WebLink
• San Joaquinucy Air Pollution Control District <br /> y J <br /> Page 8 <br /> the theoretical rate of extraction. Vapor concentrations are expected to decline rapidly and the <br /> operational period will be longer than this before cleanup is complete. We anticipate operation of <br /> the vapor extraction system for a minimum of six months. <br /> INFORMATION FOR PUBLIC NOTICE <br /> Ground Zero personnel conducted a phone book, map and internet search for public and private <br /> schools and day cares within a 1;000 foot radius of the subject property. None were found. The <br /> closest school to the site is Davis School, which is located approximately 5,000 feet northeast of the <br /> site. The nearest residence to the subject property is a single story home located approximately 340 <br /> feet north-northwest of the proposed emission point. <br /> COMPLIANCE SOURCE TESTING <br /> Once we have received the Authority to Construct, the conveyance lines and system compound will <br /> be constructed and the vapor extraction system and thermal/catalytic oxidizer will be installed. We <br /> will notify the District at least 15 days prior to conducting the initial compliance source tests. <br /> If you have any questions or require additional information regarding this application, please call <br /> Ground Zero at your earliest convenience. <br /> Respectfully, <br /> Ground Zero Analysis, Inc. <br /> Joseph L. Vasquez <br /> Staff Geologist <br /> John P. Lane <br /> CA Registered Geologist 6795 <br /> Enclosure 1: Check 9014048 in the amount of$60.00 <br /> Enclosure 2: Permit Application, Supplemental Form for Soil and Groundwater Remediation, <br /> and Supporting Documentation, Figures <br /> cc: Mr. James Barton <br /> Mr. Ray Baglietto/Mr. Frank Rauzi <br /> Mr. David Irey <br /> Mr. Lee Roy Pierce, Jr., <br /> Mr. Jeffrey Wong <br /> GAGROUNDZE1TULEBURG\Vapor Extraction permitsWEScvrltr.DOC <br /> I <br />