My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:15 PM
Creation date
4/28/2020 2:00:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
asibility Study—Enhancement of <br /> Existing Remediation Activities <br /> 8200 N. Highway 99, Stockton, CA <br /> Page 9 of 10 <br /> 4.3 Connection to Treatment System <br /> A Class A licensed contractor will modify and connect the wellhead at EW3 to the existing groundwater <br /> treatment system. The contractor will install a downhole pump with an adjustable flow rate and connect <br /> it to the existing electrical system. The GETS manifold will be modified to accommodate the additional <br /> extraction well. <br /> The GETS will continue to be monitored and sampled according to the protocol outlined in the WDR <br /> General Order No. R5-2003-004412. <br /> 4.4 Monitoring and Sampling <br /> The new extraction well will be placed on the existing groundwater monitoring regime. <br /> 4.5 Protocols and Safety <br /> All field activities performed at the site will be conducted in accordance with the GZA Field <br /> Procedures protocol and the Site specific Site Safety Plan, both of which are on file with EHD. All <br /> drilling and sampling equipment will be decontaminated between uses as required. Soil cuttings <br /> generated from drilling activities and wastewater produced from equipment decontamination will be <br /> properly labeled and contained in DOT approved 55-gallon drums, pending waste characterization and <br /> disposal. <br /> 4.6 Reporting <br /> Following the receipt of analytical data, survey data, well development summary, and disposal <br /> manifests; GZA will prepare a technical report describing field activities, results, conclusions, and <br /> recommendations for submittal to EHD, <br /> i <br /> i <br /> G:IGROUNDZEITULEHURGIReportsI0709 FS rein enhancement.doc <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.