Laserfiche WebLink
I <br /> WORK REQUEST FORM <br />' Date of Request 6/22/04 Requested Completion Date 6/23-25/04 <br /> Proj Name Tuleburge Warehouse Prod No 98-263 <br />' Site Address 8200 N Hwy 99 Morada CA Task none <br />' Project Manager John Lane Field Tech A Scoma <br />' Client Contact Ray Baglietto Phone No 209-468-0433 <br /> Regulatory Contact Jeffrey Wong Phone No 209-468-0335 <br />' Approval �__Zz Completion Date o6/;3,aV,;2_r/6T/ Ar ens <br />' Check in with store clerk "Ab" when you on site Let him know that you'll be sampling <br /> all the wells You will be purging and sampling all site wells, including VEW1 except well <br /> MW1 (INF) <br />' Measure DTW/DTB in each site well DTW reported to be approximately 65-68 from tops of <br /> casin s The order for monitoring is MW14B MW7 MW$ MW9B MW6 MWIO MWI1 <br /> MW13C, MW5 MW12 (rinse probe), MW2 MW3, MW4, VEWL MW1 <br /> Purge and sample wells in order Wells MW7, MW8, MW9, MW10 MW11 and MW14 were <br />' alI ND last time so you can reuse those drums All other wells must be contained Wells_MWI <br /> VEWL MW9B, MW13C, and MW14B are 4-inch wells All others are 2-inch <br />' Of course, monitor wells for pH, EC, temp and DTW <br />' <br /> Sample all wells for TPHG/BTEX EPA 8015B/8021B and oxygenates. EDB 1 2-DCA. <br /> ethanol, methanol (EPA 8260B) Send samples to Argon Labs for analysis <br /> 1 <br />