Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br /> Introduction-Objectives 5 <br /> Part 1: Administration 10 <br /> 1 .1 Management Approval and Designated Person 10 <br /> 1 .2 Certification 11 <br /> 1 .3 Location of SPCC Plan 13 <br /> 1 .4 Plan Review--NOV 13 <br /> 1 .5 Facilities, Procedures, not Operational 14 <br /> 1 .6 Cross-Reference with SPCC Provisions 14 <br /> Part 2: General Facility Information 15 <br /> 2.1 Facility Description and Discharge History 15 <br /> 2.2 Evaluation of Discharge Potential 16 <br /> 2.3 Topography 16 <br /> Part 3: Storage Tank Details 19 <br /> 3.1 Table 3-1 Oil Storage Containers and Capacities 19 <br /> 3.2 Facility Layout 21 <br /> 3.3 Spill Reporting 21 <br /> 3.4 Potential Discharge Volumes and Direction of Flow 21 <br /> 3.5 Inspections and Records 25 <br /> 3.6 Written Procedures and training 26 <br /> 3.7 Annual Inspections 27 <br /> 3.8 Compliance with Applicable Requirements (40 CFR 112.7(a)(2)) 27 <br /> 3.9 Spill Reporting 28 <br /> 3.10 Potential Discharge Volumes and Direction of Flow 28 <br /> 3.11 Containment and Diversionary Structures 28 <br /> 3.12 Practicability of Secondary Containment 29 <br /> 3.13 Inspections, Tests, and Records 29 <br /> 3.14 Personnel, Training, and Discharge Prevention Procedures 31 <br /> 3.15 Security 32 <br /> 3.16 Brittle Fracture Evaluation 33 <br /> 3.17 Conformance with State and Local Applicable Requirements 33 <br /> 3.18 Construction 33 <br /> 3.19 Fault Analysis 33 <br /> Part 4 Facility Operations <br /> 4.1 Delivery and Entry Operations 35 <br /> 4.2 Facility Drainage 35 <br /> 4.2.2 Secondary Containment 38 <br /> 2 <br />