Laserfiche WebLink
1 <br /> Monitoring Well Installation Report <br /> Speedy Mart,8200 N Highmay 99 <br /> • Page 8 of 8 <br /> • Initiate a quarterly groundwater monitoring and sampling program to evaluate contaminant <br /> concentration trends of the dissolved contaminant plume <br /> • Secure an alternate potable water source for site operations, such as a replacement supply well or <br /> City-supplied water, if available <br /> • Determine the effectiveness of using the existing supply well to evaluate the vertical extent of <br /> groundwater contamination at the site, such as using well packers to obtain discrete-depth <br /> groundwater samples <br /> • Destroy the existing water supply well to elinunate it as a potential vertical migration pathway <br /> Please feel free to contact the undersigned at (209) 838-9888 should you have any questions regarding <br /> this submittal <br /> Respectfully, <br /> Ground Zero Analysis, Inc <br /> ED <br /> jea4arvey, 0�, <br /> Staff Geologist JOHN p <br /> C LANE <br /> N No 6j--p 795 <br /> Q <br /> John P Lane, ��F OF VV- <br /> cc _ <br /> CA Registered Geologist No 6795 CA <br /> Marty Hartzell, RWQCB <br /> Ray Baglietto/Frank Rauzi <br /> groundzeltuieburglwellrpt do;, <br />