My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
9474
>
3500 - Local Oversight Program
>
PR0545623
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:55 PM
Creation date
4/28/2020 2:51:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545623
PE
3528
FACILITY_ID
FA0004968
FACILITY_NAME
CHEVRON 96155 (INACT)
STREET_NUMBER
9474
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
08515003
CURRENT_STATUS
02
SITE_LOCATION
9474 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AYRQFESSiQNAI.LS�S1TEll k'ART�'ERSHIY <br /> DAMES & MOORE <br /> 1713 TULARE STREET,SUITE 234, FRESNO,CALIFORNIA 93721 (249)264-4717 y <br /> y � <br />' AR 17 1989 <br /> FNUIRON1V1GrVT.'�L f��A�TN <br /> March 20, 1989 AER�lT/SEQCES <br /> l <br /> San Joaquin Local Health District Project No. 16000_165-03 <br /> Post Office Box 2009 <br /> Stockton, California 95201 <br /> Attention: Diane Hinson <br /> RE: Workplan Proposal <br /> Installation of Ground Water Monitoring Wells <br /> Former Chevron Service Station 96155 <br /> Highway 99 near Morada Lane <br /> Stockton, California <br /> Pursuant to a request of Chevron U.S.A., we have prepared a workplan proposal for the <br /> preliminary ground water contamination investigation at the above-referenced subject <br /> property. The attached proposal summarizes the details of our workplan. <br /> Chevron has requested that the San Joaquin-Local Health District is authorized to <br /> proceed with the priority review process, and agrees to the added expense thereof. We <br /> therefore look forward to a response from your department within about two weeks time of <br /> the submission of this workplan for review. <br /> A copy of this workplan has been forwarded to the Central California Regional Water <br /> Quality Control Board for their review and comment. <br /> Should you have any questions or if we may be of further service, please do not <br /> hesitate to contact our office. <br /> Respectfully submitted, <br /> DAMES & MOORE <br /> Jeffrey S. Palmer, REA <br /> Environmental Specialist <br /> is ael R. Erwin, RCE <br /> Senior Geotechnical <br /> Engineer <br /> MRE/JSP/jp <br /> lc herewith <br /> Attachment <br /> OFFICES WORLDWIDE <br /> F <br />
The URL can be used to link to this page
Your browser does not support the video tag.