My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005607
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
9474
>
3500 - Local Oversight Program
>
PR0545623
>
ARCHIVED REPORTS_XR0005607
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:29 PM
Creation date
4/28/2020 3:21:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005607
RECORD_ID
PR0545623
PE
3528
FACILITY_ID
FA0004968
FACILITY_NAME
CHEVRON 96155 (INACT)
STREET_NUMBER
9474
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
08515003
CURRENT_STATUS
02
SITE_LOCATION
9474 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Since 1898 � <br /> s = <br /> Geotechnical and Environmental Consultants • Engineering and Chemical Laboratories <br /> November 13, 1990 TL #790-056-02 I <br /> Invoice #70801 + <br /> i <br /> , <br /> For: Dames & Moore ' <br /> 1320 E . Shaw Avenue, Suite 110 <br /> Fresno, CA 93710 3 <br /> } <br /> Project: Tank Excavation and Backfill <br /> Chevron Service Station <br /> Hwy 99 and Morada Lane <br /> Stockton, California <br /> P0. No. 16000--250-44 <br /> Account No. 114--071 <br /> 3 <br /> Subject : Spot Soil Density Tests conducted on the <br /> tank excavation backfill soils . <br /> Dear Mr. Irwin: <br /> This report presents the individual compaction test results of the <br /> in-place density tests conducted on the backfill soils placed in <br /> the tank removal excavation at the above referenced location. <br /> The scope of our testing was authorized by Mr. Mike Irwin with <br /> Dames & Moore on October 18 , 1990 . <br /> The tests were performed by Val Baroni, Doug Davidson, <br /> Harold Holland, and Dennis Thompson of our Modesto office on <br /> October 19 , 22 , 23, 24 , 25 , 26 , and 27, 1990 . <br /> Project Description: This project consists of the previous <br /> removal of underground storage tanks <br /> and backfill of the resulting <br /> excavation. According to Mr. Irwin, <br /> the excavation measured approximately <br /> 60 by 60 feet in plan dimension and was <br /> about 15 feet deep . <br /> Project Specifications : According to Mr. Richard Johnson the <br /> following specifications shall apply: <br /> Uniform Building Code Standard No . <br /> 70-1 . All fill soils shall be <br /> compacted to a minimum of 90 percent of <br /> ma,cimum density as determined by the <br /> UBC 70-1 <br /> ( <br /> C 2527 Fresno Street • PO Box 1472 C 9401 West Goshen Avenue f <br /> Fresno California 93716 • (209) 268 7021 Visalia California 93291 • (209) 651 2190 <br /> C 1405 Granite Lane Suite 1 C 3701 Pegasus Drive Suite 124 <br /> Modesto California 95351 • (209) 523 0994 Bakersfield California 93308 • (805)393 5088 <br />
The URL can be used to link to this page
Your browser does not support the video tag.