Laserfiche WebLink
Chevron U.S .A. <br /> Page 16 <br /> stockpiled and a new lift of contaminated soils spread. <br /> Stockpiled, treated soil will be composite sampled and <br /> chemically analyzed prior to placement as engineered fill. <br /> Composite sampling will occur at a frequency of one composite <br /> sample for each 50 cubic yards of stockpiled soil. <br /> 16000-250-044 <br /> Corrected <br />