My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19501
>
2900 - Site Mitigation Program
>
PR0545628
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:05 PM
Creation date
4/28/2020 4:50:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545628
PE
3528
FACILITY_ID
FA0004738
FACILITY_NAME
LES CALKINS TRUCKING INC
STREET_NUMBER
19501
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
01321051
CURRENT_STATUS
02
SITE_LOCATION
19501 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti <br /> 1.0 INTRODUCTION <br /> Mr. Les~Calkins has retained Park Environmental Corporation (Park) to prepare this work <br /> plan to address the'environmental issues at the facility located at 19825 North Highway 99 in <br /> Acampo, California (Figure 1). This work plan addresses the Total Petroleum�Hydrocarbon <br /> (TPH) oil contamination that was identified When the underground diesel fuel tanks were <br /> removed from the facility. <br /> R h , <br /> 1.1 Purpose of,Investigation <br /> The purpose of the work plan is to document some of the recent work that has been ongoing <br /> at the facility and to document the program that was conceptually agreed to at the March 31, <br /> 1993 meeting between Mr. Les Calkins and his representatives and Ms. Margaret Lagorio <br /> and Mr. Michael Collins of the San Joaquin Public Health Services, Environmental Health <br /> Division (PHS/EHD). <br /> 1.2 Proposed and Ongoing Scope-of Work <br /> • Document earlier ,testing (Sampling and'analysis completed); <br /> • Level and dry stockpiled soils (Verbal approval received 3131193 from PHS/EHD); <br /> • Spray tank excavation pit water onto the spread soil stockpile to dry (Verbal approval <br /> to proceed'ireceived 3131193 from PH'S/EHD); . <br /> o Empty 16 drums containing soil boring;cuttings and place on stockpile (Verbal <br /> approval to proceed received 3131193 from PHS/EHD); <br /> ` • Remove drums from area (Verbal approval to proceed received 3/31193 from <br /> PHS/EHD);' J; 1. „ <br />'i o Prepare Work Plan (This document); <br />' • Sample sidewalls and tank pit bottom; <br /> j ifi 4 T 1 <br /> • Analyze samples for TPH as gasoline and diesel, and BTEX; <br /> oPerform geotechnical evaluation to evaluate v ate the potential risks -that further excavation <br /> of the soil from the sidewalls and tank=pit bottom due to the:proximity:of an <br /> underground natural gas line within three feet of the east.pit sidewall, an above <br /> ground electrical utility pole within five feet.of the north.and east pit sidewall., and a <br /> building corner located approximately ten feet from the northeast corner,of the.pit <br /> sidewall; 1' <br /> 5003J1 r.l <br />
The URL can be used to link to this page
Your browser does not support the video tag.