Laserfiche WebLink
r <br /> COMMENTS ON DEVELOPMENTS <br /> SA-94-20 <br /> 2 . Encroachment permit shall be required for work within road <br /> right-of-way. (Development Title Section 9-1145.2) <br /> 3 . Dedication to result in a 25 foot wide right-of-way from the <br /> centerline of the Private Road along the west property line <br /> shall be required across parcel's frontage. The owner shall <br /> execute an Irrevocable Offer to Dedicate a twenty-five foot <br /> (251 ) wide right-of-way along the the west property line of <br /> parcel. (A $225. 00 fee currently is required for processing <br /> per Development Title Table 9-240. 2 in addition to a copy of <br /> the Grant Deed, recording fee and a legal description of the <br /> parcel to be offered for dedication. ) <br /> (Development Title Section 9-1150.2) <br /> 4 . The frontage along the west property line shall be constructed <br /> in conformance with the standards for one-half of a 50-foot <br /> right-of-way Rural Road. The construction of the frontage <br /> improvements will be deferred upon execution by the owner of <br /> a Deferred Frontage and Roadway Improvement Agreement or a <br /> Secured Deferred Frontage and Roadway Improvement Agreement <br /> with a deposit equivalent to their estimated construction <br /> costs prior to issuance of a building permit/Improvement Plan. <br /> (A $260. 00 fee currently is required for processing per <br /> Development Title Table 9-240.2 in addition to a copy of the <br /> Grant Deed, recording fee, legal description of Parcel and an <br /> estimate for the required frontage improvements. The estimate <br /> and legal description shall be prepared by a Registered Civil <br /> Engineer with a typical section drawing on a form to be <br /> supplied by the Public Works Department and submitted to the <br /> Public Works Department for approval. As an option the <br /> Department of Public Works will prepare the drawing and <br /> estimate for a fee of $115. 00. ) (Development Title Section 9- <br /> 1150 . 2) <br /> 5 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building permit application. (The fee currently is $1, 651. 00 <br /> per single family dwelling unit in the Lockeford area. The <br /> fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the <br /> Engineering News Record. ) <br /> (Resolution R-90-304 , R-91-1025, R-93-167, R-94-179 ) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />