Laserfiche WebLink
T & T:Trucking page 5 <br /> 11396 Hwy 99 Frontage N, Lodi <br /> Your consultant can provide the professional services and evaluation needed for r <br /> the pumping test and provide EHD with the data and conclusions of the process. <br /> Prior to entering into final remediation, UST regulations require sites to be fully <br /> characterized. Although you must take immediate steps to abate the conditions <br /> that have placed your site in this high; priority status, by not having delineated the <br /> latera! and vertical extents of the soil and groundwater plume, your site cannot be <br /> considered fully characterized. Therefore 'a final corrective action work plan <br /> wouldnot be appropriate at this time; but corrective action taken to minimize the <br /> threat posed by impacted groundwater to the receptors can be approved as an ` <br /> `interim' corrective action. r <br /> You are hereby directed to submit a workplan to collect the necessary data <br /> to complete the lateral and vertical delineation of the impacted soil and <br /> groundwater and to complete the site characterization. The work plan is <br /> due at EHD before February 21, 2003. <br /> EHD thanks you for your cooperation and your willingness to continue this <br /> investigation. Do not hesitate to contact Mr. Infuma or Mr. Henderson if you <br /> have any questions or wish to discuss the site. You may call Mr. lnfurna at (209) <br /> 468-3454 or email him at minfurna(a-). iceho.com. Mr. Henderson can be <br /> contacted at (209) 468-3436. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Michael J. Infurn Jr., S nior REHS Nuel C. Henderson, Jr., RG <br /> LOP /,Site Mitigation Unit IV LOP I Site Mitigation <br /> MI/ <br /> c: CVRWQCB —Jim Barton, Saeramen#o <br /> c: SWRCB—CUF — Mark Owens;Sacramento " <br /> c: Brown & Caldwell - Tina Bauer 2701 Prospect Park Dr., Rancho Cordova. <br /> G <br /> k <br /> I <br />