./ %Wool <br /> DATE NAME ACCT. CODE HOURS COMMENTS <br /> 11/27/95 R. ROWE 210 4.0 <br /> SITE FIELD INSPECTION. OBSERVE SOIL BORING OPERATIONS. DIRECT AND <br /> WITNESS SOIL SAMPLING ACTIVITIES AT SITE SURROUNDING EXCAVATION/TANK <br /> PIT. SOIL STAINING AND PETROLEUM HYDROCARBON ODORS NOTED IN SLEEVED <br /> SAMPLES FROM BORINGS. <br /> 11/28/95 R. ROWE 210 4.0 <br /> SITE FIELD INSPECTION. OBSERVE SOIL BORING OPERATIONS. DIRECT AND <br /> WITNESS SOIL SAMPLING ACTIVITIES AT SITE SURROUNDING EXCAVATION/TANK <br /> PIT. SOIL STAINING AND PETROLEUM HYDROCARBON ODORS NOTED IN SLEEVED <br /> SAMPLES FROM BORINGS. CHANGE FROM PUSH POINT TO CONVENTIONAL <br /> HOLLOW STEM AUGER. <br /> 11/28/95 R. ROWE 212 I.4 <br /> TELEPHONE CONSULTATION WITH CONSULTANT REGARDING NEED TO CONTINUE <br /> FIELD WORK TO 11/29/95 FOR THE PURPOSE OF GROUTING AND SAMPLING. <br /> BORINGS TO WATER. SUGGESTED AUGERS BE LEFT IN HOLE AND SAMPLES <br /> ANALYZED TO DETERMINE IF BORINGS SHOULD BE COMPLETED TO MONITORING <br /> WELLS. <br /> 11/29/95 R. ROWE 210 2.0 <br /> FINALIZE WELL CONSTRUCTION AND COMPLETION(GROUT).INSPECT LOCATIONS <br /> OF SOIL BORINGS. INCLUDES DRIVE TIME TO AND FROM SITE. IMPACT TO <br /> GROUND WATER LIKELY. AWAITING GROUNDWATER SAMPLING AND <br /> ANALYTICAL CONFIRMATION. <br /> 11/30/95 R. ROWE 212 1.5 <br /> TELEPHONE DISCUSSIONS WITH RP AND CONSULTANT (T.TARDITI/MES SAGE & <br /> R•PREMZIC)REGARDING QUARTERLY GROUND WATER SAMPLING REQUIREMENTS. <br /> 12/01/95 R. ROWE 212 1.0 <br /> TELEPHONE DISCUSSIONS WITH RP AND CONSULTANT (T.TARDITI/MES SAGE & <br /> R.PREMZIC) REGARDING RISK BASED CORRECTIVE ACTION SAMPLING <br /> REQUIREMENTS. <br /> i <br />