Laserfiche WebLink
Date dame Acct. Code floors Comments <br /> .07/11/90 J. Kral 1 315 0.3 Review and filing of Site <br /> Assessment Report from <br /> Calscience Engineering, Inc. , <br /> dated June 29, 1990. <br /> 07/30/90 J. Krall 315 1 .1 Reviewed Site Assessment <br /> Investigation Report dated July <br /> 1990, prepared by Calscience <br /> Engineering Inc: <br /> 07/31/90 J. Krall 312 0.4 _Spoke with John Drake of <br /> Ca]science Engineering, Inc. <br /> regarding the above referenced <br /> report. It will: be necessary to <br /> sample all four wells, measure <br /> depth to groundwater and <br /> determine a gradient. <br /> 10/17/90 J. Krall 312 0.3 Spoke with Mike Marel l o of Aqua <br /> Science. Engineers, Inc. (ASE) <br /> regarding the project. <br /> 11/07/90 J. Krall 315 1 .4 Reviewed September 24, 1990 and <br /> October 5, 1990 reports from <br /> ASE. Spoke with John Drake <br /> � p e <br /> regarding the reports. Left <br /> message with Mike Marel 1 o. <br /> 11/08/90 J. Krall '315 0.2 Continued review of reports <br /> received -from ASE. <br /> 11/25/90 J. Krall 312 0.2. Received a call from ASE to go <br /> on-site for verification <br /> sampling. <br /> 11/27/90 J. Krall 311 1 .0. .-'0n-site for verification <br /> 315 0.3 sampling. Cancelled. They will <br /> reschedule.'-. <br /> 11/28/90 0. Woel fel 311' 3.0 , Dave Woelfel filled in for Joyce <br /> 315 0.5;. Krall and visited the site for <br /> verification sampling. <br /> k 11/29/90 Q. Woelfel 315 0.5; Dave Woelfel processed paperwork <br /> J. Kral1 , 315 0.2; from field sampling and reviewed <br /> case activities with Joyce Krall . <br />