My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11396
>
3500 - Local Oversight Program
>
PR0545624
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:05 PM
Creation date
4/29/2020 12:48:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545624
PE
3528
FACILITY_ID
FA0003786
FACILITY_NAME
T&T TRUCKING INC
STREET_NUMBER
11396
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05926010
CURRENT_STATUS
02
SITE_LOCATION
11396 N HWY 99 RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 0f 2 <br /> Mike Infurna [EH] <br /> From: Mike Infurna [EH] <br /> Sent: Thursday, November 08, 2007 9:16 AM <br /> To: - 'Bauer, Tina' , <br /> Subject: RE: T&T Trucking RAP <br /> j <br /> I'm still behind and confused with this site. SO go ahead and submit the RAP.Yll make the time somehow to <br /> dedicate the time for review and hopefully; understand it all. <br /> I'll get back to you hien. <br /> submit away.." <br /> put it on Geotracker and shoot me an email advising you did. I'll keep an eye open for it... <br /> From: Bauer, Tina [mailto:TBauer@BrwnCald corn] <br /> Sent: Wednesday, November 07, 2007 3:47 PM <br /> To: Mike Infurna [EH] <br /> Subject: FW: T&T Trucking RAP <br /> Mike, <br /> Hope all is going well with you. I know you are busy. I'd like to tie up the loose end of the DRAFT RAP <br /> and submit it as a FINAL"version:It probably should have just been submitted as a final rather than a draft <br /> version. Anyway, it is a process I have to'finalize and I'd like to resubmitt as a final version. <br /> Please advise. <br /> Thanks,'Tina <br /> From: Bauer,Tina <br /> Sent: Tuesday, September-18, 2007-11:36 AM ` <br /> To: 'Mike Infurna [EH]' -- <br /> Subject: `RE: T&T Trucking RAPY ' - A` <br /> You are correct -we are slightly out of sync: <br /> • We got the Executive Summary to you and initiated the public participation process, and while I was <br /> out of pocket on a potential litigation case, the RAP was prepared but waiting for my review. <br /> We received a letter from you approving the installation of the AS/SVE so we started the process <br /> forward as I was just finishing my case:- ti <br /> We got a call from the driller with an opening at the same time I was reviewing the RAP but the <br /> timing was short. The well permit application sparked your request for the RAP -which I was <br /> reviewing/editing. <br /> So, I'm responsible for being out of sync because.I was not available for several"weeks to review and <br /> finalize the draft RAP. We sent it as a draft version just in case you needed some revisions but we can <br /> easily finalize it. The RAP'is'a compliation of all the investigations, the pilot test, and the approved <br /> remediation approach. There is no new data in this report. <br /> Tina <br /> From: .Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> 12/10/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.