r <br /> Mr. Michael Infuma <br /> October 24, 2005 <br /> C Page 5 <br /> Surveying. BC will subcontract with a California-licensed land surveyor to <br /> provide X, Y, Z coordinates for each extraction well. The coordinates will be <br /> collected in a manner that complies with GeoTracker and applicable groundwater- <br /> monitoring and reporting requirements. <br /> Project Schedule and Deliverables. The field work as discussed above will <br /> require approximately four months to complete. This time-frame includes <br /> installation of two SVE wells, connecting the SVE and AS systems, and <br /> completion of the pilot test. Field work will be scheduled upon receiving written <br /> approval of the work plan from San Joaquin County. <br /> The results of the well installation and SVE and AS pilot tests will be summarized <br /> in a letter report that will be completed approximately four weeks after receiving <br /> the final laboratory results. The letter report will include a brief description of the <br /> work, results of the pilot test, a tabular summary of the analytical results, survey <br /> results, how the test was conducted, how the results were used in determining a <br /> capture zone, a graphical representation of the capture zone, and how the results <br /> of the test are used to determine parameters necessary for the design and <br /> implementation of a permanent remediation system. <br /> If you have any questions or comments,please call me at (916) 853-5316. <br /> Sincerely, <br /> BRED GEO <br /> � BROWN AND CALDW <br /> No. 6893 <br /> Tina M. Bauer P.G. <br /> Project Manager <br /> CF:ds <br /> Enclosures <br /> cc: Mr. Terry Tarditi,T&T Trucking, Inc. <br /> s <br /> i <br /> PA28000\128253-'1'&'t"Trucking WFAWork Plan svc 2.doc <br />