Laserfiche WebLink
Mr Terry Tarditi <br /> • October 2, 2002 <br /> Page 4 <br /> The following documents are enclosed with flus letter <br /> Table 1 Historical Groundwater Elevation Data <br /> Table 2 Groundwater Flow Direction and Gradient <br /> Table 3 Groundwater Analytical Data <br /> Figure 1 Site Map <br /> Figure 2 Groundwater Elevation Contour Map,June 25, 2002 <br /> Figure 3 Groundwater Elevation Contour Map,August 27, 2002 <br /> Figure 4 Water Level Elevations <br /> Figure 5 Groundwater Constituent and Isoconcentration Map, <br /> June 25, 2002 <br /> Figure 6 Groundwater Constituent and Isoconcentration Map, <br /> August 27, 2002 <br /> Figure 7 Benzene Concentrations <br /> Figure 8 Benzene and MTBE Concentrations in Well MW-1 <br /> Figure 9 MTBE Concentrations in Wells MW-2, MW-3 and MW-4 <br /> Figure 10 MTBE Concentrations and Water Level Elevations in MW-1 <br /> Attachment A Field Data Sheets <br /> Attachment B Laboratory Analytical Reports <br /> If you have any questions, please contact me at (916) 444-0123 <br /> Sincerely, Q GE�� <br /> BROWN AND CALD <br /> .No. 6893 <br /> 9. YM <br /> Project Manager Q�OF CAV��\ <br /> TMB ds <br /> Enclosures <br /> cc Ms Margaret Lagono, San Joaquin County Public Health Services <br /> Environmental Health Department <br /> Thu report was prepared in accordance wuh the standards of the enmronmental consulirng industry at the time:t oras prepared It should not be <br /> relied upon by parties other than those for whom a was prepared,and then only to the extent of the scope of work which was authorrzed Thu <br /> ,port doer notguaraantee that no addtironal environmental contamination beyond that described in thrr report exists at the site <br /> \\Bcsac02\projects\21000\21417\Reports\2ndand3rd 02gtt doc <br />