Laserfiche WebLink
Table 1. Well Construction Details, <br /> �. <br /> T&T Trucking,Lodi, California <br /> Well number <br /> Item MW-1 MW-2 MW-3 MW-4 <br /> Well Diameter and Type 2" PVC 2" PVC 2"PVC 2" PVC <br /> Function Monitoring Monitoring Monitoring Monitoring <br /> Screened interval 70-90(a) 60-80 (b) 60-80(b) 60-80 (b) <br /> Filter pack 66-90(c) 58-80(d) 58-80(d) 58-80(d) <br /> Bentonite seal interval 63-66 55-58 55-58 55-58 <br /> Cement grout 0-63 0-55 0-55 0-55 <br /> PVC= Polyvinyl Chloride <br /> Note Intervals and depth are in feet below ground surface <br /> (a)0 010-inch slot <br /> (b)0 020-inch slot <br /> (c)#2112 sand <br /> (d) Lonestar#3 sand <br /> Its <br /> P 1600016271NTABLESM XLS <br />