Laserfiche WebLink
r <br /> r <br /> • <br /> r <br /> TABLE OF CONTENTS <br /> r11369 NORTH HIGHWAY 99 <br /> Lodi, California <br /> r <br /> PROFESSIONAL CERTIFICATION and LIMITATIONS <br /> INTRODUCTION 1 <br /> Purpose and Scope 1 <br /> Site Description and Project History 2 <br />' FIELD INVESTIGATION 3 <br /> Soil and Ground Water Conditions 5 <br /> Findings 5 <br /> CONCLUSIONS &RECOMMENDATIONS 6 <br /> t• LIST OF FIGURES <br /> Figure 1 - Site Vicinity Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Site Plan and Cross Section Lines <br /> Figure 4 - Geologic Cross Section A-A' <br />' Figure 5 - Geologic Cross Section B-B' <br /> LIST OF TABLES <br />' Table 1 - Summary of Analytical Results for Soil Samples Collected by Wallace-Kuhl <br /> and Associates <br /> Table 2 - Summary of Analytical Results for Soil Samples Collected by Leeward <br />' Consultants <br /> Table 3 - Summary of Analytical Results for Water Samples Collected by Leeward <br /> Consultants <br /> rAPPENDICES <br /> Appendix A -Field Procedures <br /> Appendix B - Soil Boring Logs <br /> Appendix C - Laboratory Reports and Chain-of-Custody Documents <br />