My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005690
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11396
>
3500 - Local Oversight Program
>
PR0545624
>
ARCHIVED REPORTS_XR0005690
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:31 PM
Creation date
4/29/2020 1:06:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005690
RECORD_ID
PR0545624
PE
3528
FACILITY_ID
FA0003786
FACILITY_NAME
T&T TRUCKING INC
STREET_NUMBER
11396
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05926010
CURRENT_STATUS
02
SITE_LOCATION
11396 N HWY 99 RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECE 1� <br /> 10540 White Rock Road,Suite 180 _ I l 005 <br /> r.� Rancho Cordoza,Cahfon a 95670 0 C T i 7 2005 <br /> Tel (916)4440123 ., i ENViRu �js l HEALTH Fax (916)635-8805 EN Jig ONN E�J € HEALTH PF41IT/SERVICES <br /> PERMIT/SERVICES <br /> www brownandcaldwell com <br /> October 13, 2005 <br /> 1B R 0 W A N D 14 <br /> r <br /> "T Mr Terry Tar&ti <br /> M T&T Trucking, Incorporated <br /> 11396 North Highway 99 <br />' Lodi, California 95240 017/127960-001/1 <br /> Subject Third Quarter 2005 Groundwater Monitoring Report <br />' 11396 North Highway 99,Loch, Cahfornia <br /> Dear Mr Tarditi <br />' This letter report transmits results of the third quarter 2005 groundwater monitoring <br /> events for the referenced site A copy of this report is being submitted to the San <br /> Joaquin County Public Health Services Environmental Health Division <br /> (PHS/EHD) Quarterly sampling and report Lng is required by the PHS/EHD, as <br /> outlined in their April 12, 1999 letter to T&T Trucking, Inc <br /> WORK PERFORMED JULY- SEPTEMBER 2005 <br />' Brown and Caldwell measured water levels and collected groundwater samples for <br /> the second quarter on August 16, 2005 This sampling event was conducted in <br /> t accordance with Brown and Caldwell's Workplan for Quarterly Sampling of <br /> Monitoring Wells Thus Workplan was approved by the PHS/EHD <br />' A soil vapor extraction well installation and pilot test work plan is currently being <br /> prepared and implementation will occur as soon as feasible after review and approval <br />' by the PHS/EHD <br /> STATUS OF INVESTIGATION AND CLEANUP ACTIVITIES <br /> Four groundwater monitoring wells have been installed at the site, as shown in <br />' Figure 1 Quarterly groundwater monitoring has been ongoing since 199$ <br /> Previous groundwater monitoring results and subsurface investigations indicate <br /> I hu report zw prepared sn accordance with the standards of the m ironmental confm1fing rndurlry at the time it was prepared It should not he <br />' rrfied upon by parties other than chose for whom it uw s prrpared and then only to the extent of the scope of wort wlmh was authon rd Thr r <br /> report does notparantee that no addrtxonal enrrronmental confaminalion beyond that desenbed rn thrr report etirls at the site <br />' P\27000\127960 T&T Truckmg GW hiomtonng 2005\Reports\3rd 05gtr doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.