Laserfiche WebLink
GROUNDWATER PURGE AND SAMPLING FIELD DATA SHEET <br /> • 1 PROJECT INFORMATION WELL ID: Tnw-ILti <br />' Project Number— Task Number O awl- Date ' © Time <br /> Client T <br /> I Personnel <br /> Project Location Z Weather_ CLf - Qpm — <br />' 2 WELL DATA <br /> Casim Diameter inches Type of Casing <br />' Screen Diameter inches d Type of Screen Screen Length <br /> Total Depth of Well from TOC -50 feet <br />' <br /> Depth to Static Water from TOC � S� feet <br /> De th to Product from TOC `—" feet!! <br /> Len th of Water Column h �' �� <br /> feet ,ip�alculated Casin Volume�• al 3 to 5 times one well volume <br />' Purge Volume Calculation(one casing volume=0 041 d'h) <br /> Note 2-inch well=0 167-gal/ft flinch well=0 667 gatffl <br />' nmP� I <br /> 3 PURGE DATA Fnt11 <br /> Purge Method <br /> �r 1 <br /> Materials PumplBailer <br /> Materials RopelTubing 2 <br /> u -- Z �$ <br /> 11 <br /> Was well purged dry? ❑ Yes ❑ No Pumping Rate gallmin <br /> Spec Turbidity Other <br /> Cum Gallons N Temp s) Comments <br /> Time Removed p Cond Eh(Units) DO(Unit <br /> (Units) (N7U) <br /> 95 ,� 3. " <br /> t3 <br /> AA <br /> ,$ $� '� rt <br /> DO <br /> 4SAMPLING DATA Analyses Requested <br /> Mettrod(s) <br /> Materials PumplBailer �PsA►t i fZ. t/o `moi aSL i <br /> Materials Tubing/Rope <br /> t� i <br /> ' Depth to Water at Time of Sampling `f 6,{�_ Field Filtered*7 13 Yes *,No- i <br /> Sample IDLI -!` Sample Time L d lS #of Containers <br /> Duplicate Sample Collected ❑ Ye"'"o ID <br /> ' 5 COMMENTS <br />