Laserfiche WebLink
Mr Michael Infuma <br /> July 21, 2006 <br /> Page 8 <br /> LIST OF TABLES <br /> Table 1 Vapor Extraction Well Construction Details <br /> Table 2 System Parameters for SVE Only Pilot Test <br /> Table 3 Air Sparge Only Pilot Test Details <br /> Table 4 Combined Air Sparge/Soil Vapor Extraction Well Pilot <br /> Test Details <br /> Table 5 Groundwater Analytical Results <br /> Table 6 Air Sampling Analytical Results <br /> Table 7 Mass Extraction Rates Based on Analytical Results and Calculated <br /> Flow Rates <br /> LIST OF FIGURES <br /> Figure 1 Site Map Location <br /> Figure 2 Site Map Showing Vapor Wells and SVE/AS Equipment Location <br /> Figure 3 Total VOC Reduction with Flow versus Time SVE Only Pilot Test <br /> Figure 4 Estimated Radius of Influence at VEW-1 <br /> Figure 5 Groundwater Elevation Map AS Pilot Test Only <br /> Figure 6 VOC Concentration from VEW-1 AS/SVE Pilot Test <br /> Figure 7 MTBE Concentrations in Site Groundwater Monitoring Wells <br /> Figure 8 Concentration of MTBE in Groundwater in MW-1 from 2001 to <br /> 2006 AS/SVE Pilot Test <br /> Figure 9 Methyl Tert-butyl Ether, Benzene, and Toluene Mass Extraction <br /> Rates <br /> LIST OF ATTACHMENTS <br /> Attachment A VEW-1 and VEW-2 Geologic Boring Logs <br /> Attachment B Groundwater Sample Analytical Reports <br /> Attachment C Vapor Sample Analytical Reports <br /> REFERENCES <br /> Brown and Caldwell 2005 Work Plan for Soil Vapor Extraction Well Installation and <br /> Soil Vapor Extraction and Air Sparge Pilot Tests October 24 <br /> Brown and Caldwell 2004 Subsurface Investigation Results and Site Conceptual Model <br /> June 28 <br /> USEPA Office of Research and Development 1995 Bioventing Principals and <br /> Practice, Volume 2 <br /> P\28000\128253 1&1 1 rucking SVE\Documents\SVP Report amw doc <br />