My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005705
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11396
>
3500 - Local Oversight Program
>
PR0545624
>
ARCHIVED REPORTS_XR0005705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:32 PM
Creation date
4/29/2020 1:18:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005705
RECORD_ID
PR0545624
PE
3528
FACILITY_ID
FA0003786
FACILITY_NAME
T&T TRUCKING INC
STREET_NUMBER
11396
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05926010
CURRENT_STATUS
02
SITE_LOCATION
11396 N HWY 99 RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 43 ENGINEERING DESCRIPTION <br /> r <br /> Implementation of DPE involves construction of extraction wells(or modification of existing monitoring <br /> wells) and installation of extraction and treatment equipment Figure 4-1 presents a schematic of a typical <br /> DPE system Generally,the technology required for design and construction of a DPE system is well <br />' established and is largely based on experience gamed from implementation of separate SVE and <br /> groundwater extraction systems Specific design factors related to the method of DPE employed ultimately <br /> determine the physical as well as operating characteristics of the system and influence its ability to achieve <br /> site-specific remediation goals The following subsections discuss general DPE system design and describe <br /> ' characteristics of the three types of DPE systems <br /> 4.3.1 Dual-Phase Extraction System Design <br /> DPE system design considerations include extraction well construction, anticipated vapor and water flow <br /> rates,vapor/liquid separation requirements, and vapor and liquid treatment requirements Site <br /> characteristics,including soil pneumatic and hydraulic conductivities,contaminant vertical and horizontal <br /> distributions,potential groundwater treatment and discharge requirements,and the presence of existing <br /> monitoring or extraction facilities,largely determine which type of DPE will meet remedial design <br /> objectives most effectively <br /> 4.311 Pilot Testing <br /> ' Well placement and extraction system capacity and design are usually based on the results of pilot testing <br /> Pilot test activities focus on both water and vapor extraction characteristics Frequently, aquifer hydraulic <br /> ' properties are determined by aquifer step testing followed by pump testing A conventional vapor <br /> extraction test may also be conducted to determine soil vapor flow characteristics and vadose zone of <br /> influence DPE pilot testing is then conducted to determine both step and steady-state characteristics of the <br /> rextraction system Parameters that may be monitored during testing include the following <br /> ' Induced vacuum versus distance <br /> ' Water drawdown versus distance <br /> 4-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.